Similar Projects
Main Street Intersection Improvements
Results
Less than $899,010 est. value
Columbia, SC

Greek Village Student Parking Development
Results
$400,000 to $450,000 est. value
Columbia, SC 29208

Carolina Crossroads Phase 1 – Colonial Life Boulevard
Results

Decker Woodfield NIP D1 Faraway Drive Sidewalk Project
Results
Columbia, SC 29204

Parking Lot Restoration Services
Post-Bid
Columbia, SC

Parking Lot Resurfacing and Repair
Results
Less than $436,578 est. value
Columbia, SC 29201

Richland Library Miscellaneous Projects (Asphalt Paving, Concrete Ramp, Synthetic Turf, Outdoor Painting)
Post-Bid
$220,000 to $270,000 est. value
Columbia, SC 29201

Water Maintenance Utility Cut Repairs District 4
Results
Columbia, SC

Sidewalk Improvement/Granby Hall ADA Ramp Area
Results
$30,000 to $70,000 est. value
Columbia, SC

Two Notch Road #1328 Super Stop
Results
Less than $459,512 est. value
Columbia, SC 29223

Blythewood Pedestrian Railing System
Term Contract
Post-Bid
Blythewood, SC 29016

Water Maintenance Utility Cut Repairs District 2
Results
Columbia, SC

Water Maintenance Utility Cut Repairs Districts 1 and 3
Results
Columbia, SC

Ramp Modification
Post-Bid
Less than $20,000 est. value
Columbia, SC 29240

Park Street Streetscape
Post-Bid
Columbia, SC 29215

Last Updated 11/26/2019 02:43 PM
Project Title

Sidewalk Package S12 Harrison Road Sidewalk

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SLBE Participation Goal for this project is 19%. The Harrison Road sidewalk project consist of constructing 2465 SY of 5 ft wide 4” thick concrete sidewalk. Additionally, 2330 lf of 1’-6” lf of vertical curb and gutter, 80 CY of retaining wall, 970 SY of 6’ thick concrete driveway and installing approx. 1190 lf of various size drainage pipe. 1. Work shall include all labor, equipment and materrials necessary to construct all of the work in a craftman like manner.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents