Similar Projects
Stormwater Pond Bulkhead Improvements
Post-Bid
FL

Culvert Pipe Replacement Emerson Drive at Canal C-51
Post-Bid
Less than $455,665 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement - Units 23 and 56
Results
Less than $667,000 est. value
Palm Bay, FL 32907

Baseflow Basin Project
Results
Melbourne, FL 32940

Orange Street Drainage Improvements
Post-Bid
Melbourne Beach, FL 32951

Drainage Repair
Results
Less than $400,000 est. value

R and R Intermediate Bridge
Results
Less than $1,417,414 est. value
FL

R and R Minor Bridge
Results
Less than $153,006 est. value
FL

B-5 2nd Avenue / Riverside Drive Off-Line Retention Area
Results
$136,985 est. value
Indialantic, FL

Fabric Formed Revetment Installation Services
Term Contract
Results
$100,000 est. value
Melbourne, FL 32901

Culvert Pipe Replacement – Waterbury Avenue at C-39 and Freehold Avenue at C-41R
Results
Less than $821,320 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement - Jacobin @ C-60
Results
Palm Bay, FL

Oceana Beach Access Dune Crossover
Results
$28,876 est. value
Satellite Beach, FL 32937

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Culvert Pipe Replacement - Units 24 and 25
Results
Less than $1,295,000 est. value
Palm Bay, FL 32907

Last Updated 01/08/2020 07:26 AM
Project Title

Culvert Pipe Replacement - Unit 18

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal, disposal, re-installation, and restoration of twelve cross and/ or side drain culvert pipes located in the City of Palm Bay’s Port Malabar Unit (PMU) 18. This is a turnkey project and shall include all incidentals required to complete the project such as utility relocations, material furnishings, and restoration work associated with the installation of the culvert pipes identified in the attached design plans. All Maintenance of Traffic (MOT) costs required shall be included in the bid as part of the project construction cost. Where detour operations are planned, the contractor shall furnish plans to the City at least two weeks prior to implementation to allow adequate review and approval time. A pre-construction video shall be performed by the contractor to document existing conditions of each location prior to mobilization and shall be used for dispute resolution of any existing damage. Two copies shall be provided to the City for retention.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents