Similar Projects
Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles
Infrastructure
Conception
$35,000,000 est. value
Los Angeles, CA

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Walmart Warranty Work 2022
Infrastructure
Bidding
$300,000 est. value
Tehachapi, CA

Talbert Channel Storm Drain Repair Project
Infrastructure
Bidding
$86,289 est. value
Fountain Valley, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Reported 06/16/2022 03:29 PM
Project Title

Tidal Barriers and Levee Upgrades

Physical Address View project details and contacts
City, State (County) Corte Madera, CA   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Marina Village and Mariner Cove Long Term Tidal and Flood protection. As of June 15, 2022, this project is included in the Town of Corte Madera's FY 2020-2021 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents