Similar Projects
Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Willard Road Stormwater Improvements Near Springfield/Branson Regional Airport - 20-0024 - City of Springfield
Infrastructure
Conception
$320,000 CJ est. value
Springfield, MO 65803

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Boyce Mixed Use Development
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Republic, MO 65738

Battlefield Corridor Improvements - Lone Pine to Luster
Infrastructure
Bidding
$10,700,000 CJ est. value
Springfield, MO 65807

Group 6 Public Sewer Rehabilitation - Sewer Main Cleaning, CCTV and Cured-in-Place Pipe (CIPP)
Infrastructure
Bidding
$200,000 CJ est. value
Springfield, MO 65806

Building Demolition and Site Cleanup (List 10-26)
Demolition, Infrastructure
Post-Bid
Springfield, MO

2022 Marker Board Installation for Truman Elementary School
New Construction
Post-Bid
Springfield, MO 65803

FEMA Safe Room for Walnut Grove R-V School
Addition - 5,073 SF
Results
Walnut Grove, MO 65770

Fassnight Creek Greenway Trail
New Construction, Infrastructure
Results
$459,895 CJ est. value
Springfield, MO 65806

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

Willard Road Stormwater Improvements near Springfield/Branson Regional Airport - 20-0024 - City of Springfield
Infrastructure
Conception
$320,000 CJ est. value
Springfield, MO 65803

Last Updated 04/21/2023 08:33 AM
Project Title

Willard Central Elementary Safe Room & Classroom Addition Bid Package B

Physical Address View project details and contacts
City, State (County) Springfield, MO 65802   (Greene County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,906,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Specifications to be authenticated by Paragon Architecture and the undersigned seal is limited to the specification sections listed below. Paragon Architecture hereby disclaims any responsibility for all other specification sections relating to or intended to be used for any part of this project other than those prepared by Paragon Architecture, LLC.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents