Similar Projects
Regional HVAC&R
Term Contract, Infrastructure
Design
Norfolk, Virginia Beach, VA 23511

Regional HVAC&R
Term Contract, Infrastructure
Design
Norfolk, Virginia Beach, VA 23511

Propane Boiler Replacement and Conversion
Alteration
Bidding
Ewing, Jonesville, Rose Hill, VA 24248

Propane Boiler Replacement and Conversion
Alteration
Bidding
Ewing, Jonesville, Rose Hill, VA 24248

General Electrical/Mechanical/Construction Services
Term Contract
Post-Bid
$279,675 est. value
Daleville, VA 24083

Boiler Chemistry Maintenance
Term Contract
Post-Bid
Bland, Burkeville, Craigsville, Dillwyn, Goochland, Jarratt, State Farm, Waverly, VA 23225

Boiler Replacement Project
Results
Quantico, VA

Clarifiers 5-8 Mechanism Replacement at Proctors Creek WWTP
Results
Less than $3,060,900 est. value
Chester, VA 23836

Hawkins Building Heating System Upgrade
Renovation, Term Contract
Bidding
Danville, VA 24540

Ocean Lakes High School Boiler Plant Replacement
Post-Bid
Virginia Beach, VA 23454

Cooling Towers
Results
Richmond, VA

Oakleaf Boilers and Gas Line Replacement
Alteration
Bidding
Norfolk, VA 23523

Provide and Install (1) Natural Gas Fired Steam Boiler
Post-Bid
Portsmouth, VA

Graphitization Furnace
Results
Hampton, VA 23681

Boiler Replacements for Linkhorn Park, New Castle and Seatack Elementary School
Alteration
Bidding
Virginia Beach, VA 23451

Reported 12/29/2021 12:00 AM
Project Title

Boiler 1, 2, and 3 Repairs at the Buckingham Correctional Center

Physical Address View project details and contacts
City, State (County) Dillwyn, VA   (Buckingham County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Boiler 1, 2 and 3 repairs at the Buckingham Correctional Center. The project is generally described as the repair of three Kewanee 7L286 coal fired boilers with Detroit Low Stoker, single retort grates. The project shall include the repair of the damaged furnace refractory in each boiler as needed, ensure airflow through over fire air piping system, testing/verification that boiler tuyeres are operating normally and confirm proper airflow.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents