Similar Projects
Pool House Roof Repairs at Sampson Playground
Renovation
Design
$200,000 CJ est. value
New Orleans, LA 70126

Pool House Roof Repairs at Sampson Playground
Renovation
Design
$200,000 CJ est. value
New Orleans, LA 70126

FCC Oakdale - Roof Replacement And Mold Remediation
Renovation
Bidding
$10,000,000 CJ est. value
Oakdale, LA 71463

Maplewood Middle & Elementary Roof Repairs
Renovation
Sub-Bidding
$120,000 CJ est. value
Sulphur, LA 70663

New Roofing Overlay at L. Leo Judice Elementary School
Renovation
Sub-Bidding
$242,989 CJ est. value
Scott, LA 70583

South Terminal and South Campus Metal Roof and Exterior Siding Repair
Alteration
Post-Bid
Kenner, LA 70062

MSA West Academy Re-Roof - Shingle Roofs
Alteration
Post-Bid
Plaquemine, LA 70764

New Retrofit Roof on Maintenance/Warehouse Building for Rivarde Juvenile Detention Center
Alteration
Results
Harvey, LA

Shrink Wrap Roof Repair
Term Contract
Results
$100,000 to $300,000 est. value
New Orleans, LA

Northside High School Roof Replacement
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Lafayette, LA 70501

Emergency Bid - Noab - Metal Roofs & Wall Panel Repair
Renovation, Infrastructure
Post-Bid
New Orleans, LA

Washington Marion High School - Roofing Replacement
Alteration
Results
$955,269 est. value
Lake Charles, LA 70615

Bossier Instructional Center BPSB, Storm Damage Roof Replacement
Alteration
Post-Bid

Northside High School Roof Replacement
Alteration
Results
Lafayette, LA 70501

2022 Reroofing of Reeves High School
Alteration
Post-Bid
Reeves, LA 70658

Last Updated 07/20/2023 11:34 PM
Project Title

Roof Replacement, Bogard Hall, Louisiana Tech University

Physical Address View project details and contacts
City, State (County) Ruston, LA 71270   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 27, 2022, an architect has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September 2023. *The closed solicitation has been included below for reference: (Your attention is called to the 2:00 p.m. deadline exceptions WILL NOT be made). Applications shall be submitted on the standard LSB - 1 (September 2019 edition) only, with no additional pages attached. Please be sure to use an up-to-date copy of the form. Do not attach any additional pages to this application. Applications with attachments in addition to the pre-numbered sheets or otherwise not following this format will be discarded. One fully completed signed copy of each application shall be submitted. The copy may be printed and mailed or printed and delivered or scanned in PDF format and e-mailed. Printed submittals shall not be bound or stapled. E-mailed PDF copies, as well as printed copies, shall be received by Facility Planning & Control within the deadline stated above. The date and time the e-mail is received in the Microsoft Outlook Inbox at Facility Planning & Control shall govern compliance with the deadline for e-mailed applications. Timely delivery by whatever means is strictly the responsibility of the applicant. By e-mailing an application the applicant assumes full responsibility for timely electronic delivery. DO NOT submit both printed and e-mail copies. Any application submitted by both means will be discarded. 7. Roof Replacement, Bogard Hall, Louisiana Tech University, Ruston, Louisiana, Project No. 19-671-22- 01, F.19002407. This project consists of the removal and replacement of roofing materials on three levels of Bogard Hall. Designer shall comply with requirements of Facility Planning & Controls Instructions to Designers Roofing Systems. There is an approximately 23,100 s.f. existing built-up roof that will be replaced with a new a State of Louisiana approved 20 year warrantied SBS Modified Bitumen roofing system over new tapered polyisocyanurate insulation where necessary to achieve positive drainage. Also install new metal and/or elastomeric flashings, and make adjustments if any to rooftop equipment, curbs, piping and other rooftop mounted systems. The roof system will be installed in accordance with manufacturers recommendations for installation. The Designer shall be responsible for evaluating the existing deck to ensure that the roof deck is capable of accepting the new roofing system. Primary and secondary drainage will be reworked as necessary to meet current code requirements. In addition, there are areas of slate roofing that will be replaced. The scope of work shall be prioritized and limited as necessary to keep within the available funds. Should any suspect asbestos containing materials be encountered, the Designers contract will be amended to provide for proper sampling, testing, abatement and air monitoring, as required. The building will remain occupied for the duration of the project. The Designer shall prepare and submit all required drawings to Facility Planning & Control in AutoCAD and hard copy. Drawings shall follow the format specified in the Instructions to Designers for AutoCAD Drawings Submittal. The available funds for construction (AFC) are approximately $900,000.00 with a fee of approximately $64,171.00. Contract design time is 90 consecutive calendar days; including 30 days review time. Thereafter, liquidated damages in the amount of $100.00 per day will be assessed. Further information is available from Thomas Campbell, Facility Planning & Control, thomas.campbell@la.gov, (225)342-9664. GENERAL REQUIREMENTS APPLICABLE TO ALL PROJECTS: Applicants are advised that design time ends when the Documents are complete, coordinated and ready for bid as stated in to Article 3.3.1 (4) of the Capital Improvements Projects Procedure Manual for Design and Construction. Documents will be considered to be complete, coordinated and ready for bid only if the advertisement for bid can be issued with no further corrections to the Documents. Design time will not necessarily end at the receipt of the initial Construction Documents Phase submittal by Facility Planning and Control. Any re-submittals required to complete the documents will be included in the design time. In addition to the statutory requirements, professional liability insurance covering the work involved will be required in an amount specified in the following schedule. This will be required at the time the Designers contract is signed. Proof of coverage will be required at that time. SCHEDULE LIMITS OF PROFESSIONAL LIABILITY Construction Cost $0 to $10,000,000 $10,000,001 to $20,000,000 $20,000,001 to $50,000,000 Over $50,000,000 Limit of Liability $1,000,000 $1,500,000 $3,000,000 To be determined by Owner Applicant firms should be familiar with the above stated requirements prior to application. The firm(s) selected for the project(s) will be required to sign the states standard Contract Between Owner and Designer. When these projects are financed either partially or entirely with Bonds, the award of the contract is contingent upon the sale of bonds or the issuance of a line of credit by the State Bond Commission. The State shall incur no obligation to the Designer until the Contract Between Owner and Designer is fully executed. Firms will be expected to have all the expertise necessary to provide all architectural services required by the Louisiana Capital Improvement Projects Procedure Manual for Design and Construction for the projects for which they are applying. Unless indicated otherwise in the project description, there will be no additional fee for consultants. Facility Planning and Control is a participant in the Small Entrepreneurship Program (the Hudson Initiative) and applicants are encouraged to consider participation. Information is available from the Office of Facility Planning and Control or on its website. ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY FACILITY PLANNING AND CONTROL OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE SELECTION BOARD MEETING. The tentative meeting date for the Louisiana Architectural Selection Board is Wednesday, September 21, 2022 at 10:00 AM in room 1-136A-B of the Claiborne Building, 1201 North Third Street, Baton Rouge, LA 70802.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents