Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

Paving
Infrastructure
Post-Bid
Cushing, MN

Cedar Street and Driftwood Street Improvements
Results
Royalton, MN

2021 Street Improvements
Results
$2,800,000 est. value
Little Falls, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 Surface Improvements
Results
$2,800,000 est. value
Little Falls, MN

Mill Bituminous, Bituminous Surface and Aggregate Surface
Infrastructure
Post-Bid
MN

2021 Fourteenth Street SE Improvements
Infrastructure
Results
$390,000 est. value
Little Falls, MN

4th Street East Improvements
Infrastructure
Post-Bid
$300,000 est. value
Little Falls, MN 56345

2021 Safe Routes to School
Infrastructure
Results
Little Falls, MN

Micro-Surfacing and Bituminous Seal Coat
Infrastructure
Results

11th Street Northeast Improvements
Infrastructure
Results
Little Falls, MN 56345

Charles A. Lindbergh State Park Vault Toilets and Site Improvements
New Construction, Infrastructure
Results
$80,000 est. value
Little Falls, MN 56345

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

2022 4Th Street East Improvements - Material Contract
Infrastructure
Results
Little Falls, MN

Last Updated 08/23/2022 04:32 AM
Project Title

Rail Crossings and Track Maintenance at Camp Ripley

Physical Address View project details and contacts
City, State (County) Little Falls, MN 56345   (Morrison County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Paving/Reconstruction, Railroad/Subway, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Camp Ripley, 15000 Highway 115, Little Falls, MN 56345 Project Estimated Value Range: $300,000 to $400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work will be done under one prime contract that includes Civil / Rail Construction. This project is a Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned (VO) preference. SCOPE OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Reconstruction of two (2) rail crossings, maintenance of eight (8) switches and general rail maintenance on Camp Ripley, Little Falls, MN. Final completion of the work will be on or before June 30, 2023.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents