Similar Projects
Purchase and Installation of the Following: 1- Split System Air Handling Unit With a Hot Water Heat-x Air Handler
Alteration
Bidding
$300,000 est. value
Montgomery, WV

J044--Boiler Project-581
Post-Bid
Huntington, WV 25700

Request for Quotations #51000 HVAC System Maintenance at WVNET
Renovation, Term Contract
Post-Bid
Morgantown, WV 26505

Byrd/Snyder Hall Boiler Replacement
Results
$827,264 est. value
Shepherdstown, WV

Boiler Repairs - Salem Correctional Center and Jail
Results
$170,060 est. value
WV

Phase III of a New HVAC System at the Fayette County Judicial Annex
Alteration
Post-Bid
Fayetteville, WV

FBI CJIS Boiler Inspection Services
Results
Clarksburg, WV

Waste Oil Burner
Alteration
Post-Bid
Princeton, WV

Building 5 High Pressure Boiler Removal Project
Alteration
Results
Charleston, WV 25311

N041--Air Stack Modular Chiller System Troubleshooting & Repair
Term Contract
Post-Bid
Clarksburg, WV 26301

PHS Stack Demo and Boiler Replacement
Demolition, Alteration
Results
Parkersburg, WV 26101

Parks Chief Logan Lodge Heater Replacements and Installation
Alteration
Post-Bid
Chapmanville, WV 25508

Walk-in Freezer and Cooler Lashmeet Matoaka
Alteration
Results
Matoaka, WV 24736

B 6 Boiler Maintenance
Term Contract, Alteration
Post-Bid
Charleston, WV 25301

Supply and Install Fuel Pumps and Monitoring System
Term Contract
Results
Beaver, WV 25813

Last Updated 05/18/2022 05:53 AM
Project Title

Blower Replacement

Physical Address View project details and contacts
City, State (County) Weston, WV   (Lewis County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Contract #1: Removal of existing blower and installation on a new 100 HP ESP Eurus 6024 Blower Package with VFD including all necessary piping modifications

Details

Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Gas Fans, Blowers, Pumps and Boosters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents