Similar Projects
Replace OR Chillers
Alteration
Design
$1,000,000 to $2,000,000 est. value
Albany, NY 12208

Annual Materials Bid List for Weatherization Program
Term Contract
Bidding
NY

Job Order Contracting - Area 2 - HVAC
Alteration
Bidding
$500,000 to $1,000,000 est. value
Albany, NY

Heating Unit Replacement
Post-Bid
Albany, NY 12209

Heating Unit Replacement
Renovation
Post-Bid
Schenectady, NY 12303

J041--528A8-19-807 Replace Cooling Towers 1 & 2
Results
$1,000,000 to $5,000,000 est. value
Albany, NY

H141--HVAC Maintenance & Repair Services
Results
Albany, NY

Rehabilitate Office and Building Entrance - HVAC
Alteration
Bidding
$100,000 to $250,000 est. value
Latham, NY 12110

Heating Unit Replacement
Renovation
Post-Bid
Cohoes, NY 12047

J041--HVAC Controls & BAS Full Maintenance & Repair Services
Results
Albany, NY

HVAC Planned Preventative Maintenance (Quarterly Visits) and Hourly Rate for Repairs
Term Contract
Post-Bid
Albany, NY 12210

Cleaning of Kitchen Hoods at Albany County CF and Shaker Place Rehabilitation Nursing Center
Term Contract
Results
Albany, NY 12207

Heating Unit Replacement
Renovation
Post-Bid
$6,500 est. value
Cohoes, NY 12047

2021-2024 Air Conditioning and Ventilation System Annual Start Up with Preventative Maintenance and/or Repair Services in Albany, Rensselaer, Saratoga and Schenectady Counties
Results

Heating Unit Replacement
Renovation
Post-Bid
$6,500 est. value
Albany, NY 12203

Reported 05/13/2022 12:00 AM
Project Title

Heating Unit Replacement

Physical Address View project details and contacts
City, State (County) Cohoes, NY 12047   (Albany County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $18,000 to $23,000
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of 2 High efficiency electric heat pumps. The Heat pumps need to be 16,000 BTU. The units will be placed in the back yard of the home. One unit for the first floor and one unit for the second floor. The existing heating units in the basement need to be made inoperable and the gas lines capped at a safe location.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents