Similar Projects
Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Gooseberry Creek Revitalization Strategy – Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Aluminized Type 2 Corrugated Steel Pipe
Term Contract
Post-Bid
Schenectady, NY 12305

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Pre-Cast Catch Basin and Frame and Grate
Term Contract
Post-Bid
Schenectady, NY 12305

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Hydro Plant Canal Maintenance Project
Post-Bid
Watertown, NY 13601

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Corrugated Metal Pipe
Term Contract
Post-Bid
Delmar, NY 12054

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Replacement of County Road 33 (CB 198) Culvert over Blind Pond Brook
Post-Bid
Monticello, NY 12701

Last Updated 05/05/2021 09:15 AM
Project Title

Furnish and Install Glass Fiber Reinforced Plastic Pipe Liner in Culvert

Physical Address View project details and contacts
City, State (County) Rochester, NY   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install a Glass Fiber Reinforced Plastic Pipe liner system having a 27” x 59” outer diameter with specific pipe arch shape/profile as described in the attached plans which are Attachment A. The work includes slip lining, bulk heading and cellular grouting of the annual space between the host pipe arch and new pipe arch. The site is located on Phillips Road in the Town of Webster approximately 50 feet south of the Phillips Road/San Jose Drive intersection where 3 existing metal pipe arches convey storm water under Phillips Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents