Similar Projects
2022 Cutting Hall and Falcon Recreation Center Carpet Replacement
Alteration
Bidding
Arlington Heights, IL

Master Facility Plan
Demolition, Alteration
Bidding
Park Ridge, IL

JPMC Carpet Broadloom and Tiles
Term Contract
Post-Bid
Springfield, IL 62702

Epoxy Flooring, Maintenance Building
Post-Bid
Libertyville, IL 60048

B Building Finish Replacements
Renovation
Results
Less than $102,750 est. value
Carterville, IL 62918

Centennial East Scene Shop Flooring
Renovation
Results
Normal, IL 61790

Storage Facility Concrete Floor Installation and Truss Repair
Alteration
Bidding
$100,000 est. value
Libertyville, IL

Carpet Replacement Building 11
Post-Bid
Jacksonville, IL 62650

Kitchen Floor Tile Replacement at Ogden Elementary School
Results
Chicago, IL 60610

Flooring Replacement Project at The Robert J. Miller Homeland Security Education Center
Alteration
Bidding
Glen Ellyn, IL

Athletic Flooring at Buffalo Grove and Elk Grove High Schools. District 214
Post-Bid
Arlington Heights, IL

Lincolnwood SD 74 Rutledge Hall Flooring Replacement
Results
Lincolnwood, IL

Fitness Center Flooring Project
Alteration
Bidding
Mattoon, IL

J0199 Carpet Install Effingham Rob
Term Contract
Post-Bid
Effingham, IL 62401

2021 Flooring Replacement
Results
Crystal Lake, IL

Reported 03/08/2022 12:00 AM
Project Title

VCT/Carpet Floor Installation - Hallways and Classrooms

Physical Address View project details and contacts
City, State (County) Bartonville, Peoria, IL 61607   (Peoria County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of flooring and vinyl baseboard. The flooring will be o ne (I) color of carpet or VCT (Vinyl Composite Tile) as specified in project summary. The work in the carpeted spaces incl udes: The installation of carpet over existing tile, the removal of existing vinyl baseboard and installation of new vinyl baseboard. The work in the VCT areas includes the installation of new VCT over freshly abated asbestos floor tile and the removal of (if needed) and installation of new vinyl baseboard. The work will need to be conducted while students and staff are occupying the building in areas outside of the immediate work area.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents