Similar Projects
Last Updated | 10/06/2023 07:31 AM |
Project Title | Howell Island Conservation Area Causeway Demolition and Removal |
Physical Address | View project details and contacts |
City, State (County) | Chesterfield, MO 63005 (Saint Louis County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Environmental, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $253,797 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Howell Island Conservation Area Causeway Demolition and Removal Site Directions: N. Eatherton Road, Chesterfield, MO 63005 (38.664174N, -90.679907W) The work of the Contract consists of the demolition and removal of the existing concrete causeway and the installation of a riprap aggregate cap at the Howell Island Conservation Area. The scope of work includes all labor, equipment, materials, erosion control, temporary traffic control, site preparation, construction, or other requirements as specified within the contract documents. Estimate: $264,350 - $357,50 Projects of $100,000 or more specific goals are: MBE 10 % and WBE 5 % The Bidder agrees to complete the work within Sixty (60) Working Days from the date specified in the written Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |