Similar Projects
Gulfstream Aerospace Service Center
New Construction - 160,000 SF
Design
$10,000,000 CJ est. value
Fort Worth, TX 76177

Upt 2.5 Hanger 12 & 64 Renovation
Renovation
Design
$100,000 to $250,000 est. value
Randolph, TX

CommutAir Hanger Renovation
Renovation - 3,108 SF
Bidding by Invitation
$600,000 est. value
Houston, TX 77032

Hangar Construction
New Construction
Post-Bid
Sherman, TX 75090

Aircraft Hangar Hydraulics System Repair, Redesign and Service
Post-Bid
San Antonio, TX 78236

T-Hangars Replacement of Row A and New Row E at Bay City Regional Airport
Results
Bay City, TX 77414

Sugar Land Regional Airport Hangar
New Construction - 40,000 SF
Results
$8,000,000 est. value
Sugar Land, TX 77498

Braniff Hangars Phase II
New Construction - 49,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dallas, TX 75209

McKinney Airport Hangars
New Construction
Construction
McKinney, TX 75069

Aviation Box Hangar - Mid-Way Regional Airport
Post-Bid
Midlothian, TX 76065

Mccampbell-Porter Airport
Results
Less than $514,000 est. value
Aransas Pass, TX 78336

Galaxy East Hangar Build Out
Renovation - 2,700 SF
Construction
$200,000 est. value
Houston, TX 77061

Palacios Municipal Airport Box Hangar Project
Post-Bid
Palacios, TX 77465

Wharton Regional Airport Hangar Improvements
Results
$675,390 est. value
Wharton, TX 77488

Thomas Airport Hangar Maintenance
Post-Bid
Sinton, TX 78387

Last Updated 11/20/2019 11:00 AM
Project Title

4540 Glenn Curtiss - Hangar T5 Repairs

Physical Address View project details and contacts
City, State (County) Addison, TX 75254   (Dallas County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 to $80,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair floor track as needed. Concrete will need to be removed and some track replaced and welded; Remove sheeting and insulation from doors. (Leave sheeting on site for airport); Repair/inspect all rollers/wheels on top and bottom of all four doors; Inspect/replace electrical power rail/collector as needed; Check/repair all bracing on hangar opening as well as on doors prior to installation; Put doors back in place and secure; Install new insulation and sheeting along with trim. (Sheeting/fasteners color is Light Stone and trim is Koko brown); Install new rubber trim between the doors to keep debris out; Hook up electrical and test operation. Check and test open/close limit switches; Inspect walk-thru door for smooth operation, make repairs/replace as needed.

Details

Division 03 - Concrete.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents