Similar Projects
Water Line Replacement - Del Robles/Foothill/Camino - CP76300037 - City of Simi Valley
Infrastructure
Conception
$730,000 est. value
Simi Valley, CA

Water Line Replacement - Hilltop Road / Oak Knolls - CP76300036 - City of Simi Valley
Alteration
Conception
$550,000 est. value
Santa Susana, CA 93063

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

Camarillo Hills Drain Replacement at Ventura Boulevard - SD-5052 - City of Camarillo
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Rebuild Paramount Ranch & Rocky Oaks Administrative Area, Santa Monica Mountain
Renovation, Infrastructure - 20,060 SF
Bidding
$10,000,000 CJ est. value
Thousand Oaks, CA 91362

Oxnard Beautification Project Volunteer Coordinator - Rebid
Infrastructure
Bidding
$300,000 CJ est. value
Oxnard, CA 93033

Utilities Upgrade, and Interior Quad Renovation, Las Posas Elementary School
Renovation, Infrastructure
Post-Bid
$1,750,000 CJ est. value
Camarillo, CA 93010

Utilities Upgrade, and Interior Quad Renovation, Las Posas Elementary School
Renovation, Infrastructure
Post-Bid
$1,750,000 CJ est. value
Camarillo, CA 93010

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Harvard Boulevard Sewer Pipeline and Water Mainline Replacement Project
Infrastructure, Alteration
Results
$14,000,000 est. value
Santa Paula, CA 93060

Wendy Drive Mixed Use Development
New Construction, Infrastructure - 11,790 SF
Pending Verification
$2,500,000 CJ est. value
Thousand Oaks, CA 91320

Rancho Conejo Boulevard
Addition, Demolition, Infrastructure, Build-out - 7,700 SF
Pending Verification
$2,000,000 CJ est. value
Thousand Oaks, CA 91320

Los Angeles Avenue Landscape Renovation and Wall Enhancements - M0046 - City of Moorpark
Infrastructure
Conception
Less than $500,000 est. value
Moorpark, CA 93021

Auto Mall Drive Auto Dealership
Addition, Demolition, Infrastructure, Renovation
Design
$800,000 CJ est. value
Westlake Village, CA 91362

Bridge Preventative Maintenance Plan Phase I
Infrastructure
Bidding
$730,000 CJ est. value
Ventura, CA 93001

Last Updated 10/12/2022 09:33 AM
Project Title

Pump Station No. 4 Rehabilitation

Physical Address View project details and contacts
City, State (County) Camarillo, CA 93010   (Ventura County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $240,350 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Pump Station No. 4 is in need of rehabilitation involving the replacement of sewage pump equipment, pipe and electrical equipment. Questions - Thang Tran Right to reject.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents