Similar Projects
Septic System
Post-Bid
Frenchville, ME 04745

Furnish Materials and Install One Septic System
Post-Bid
Fort Kent, ME

Water Main and Sewer Main Replacement
Results
Limerick, ME 04048

North End Harward Street Pump Station Drainage Area Sewer Rehabilitation Project
Results
Less than $552,000 est. value
Bath, ME

Furnish Materials and Install Four (4) Septic Systems
Post-Bid
Easton, ME 04740

2020 Lining Projects
Results
Westbrook, ME

Septic System
Post-Bid
Bridgton, ME

Hill Street Cross Country Sanitary Sewer Project
Results
Saco, ME

Waste Pumping Services
Term Contract
Post-Bid
Calais, ME 04619

Septic Tank Pumping and Pump Station Maintenance Work
Results

Sanitary Tanks Cleaning
Post-Bid
Kittery, ME 03904

Catch Basin Cleaning and Vacuuming Services
Results

Trenchless Conduit
Post-Bid
Kennebunk, ME

Maine Avenue Sewer Line Repair
Results
Farmingdale, ME

Septic Systems
Post-Bid
Fort Kent, ME

Last Updated 06/01/2021 10:08 AM
Project Title

Fore Street/Eastern Promenade Sewer Separation

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: The Fore Street/Eastern Promenade Sewer Separation Project is located along Fore Street/Eastern Promenade from approximately 100 Fore Street to the intersection of Morning Street with the Eastern Promenade. The project includes construction within portions of Waterville Street, St. Lawrence Street, Atlantic Street, Munjoy Street, O’Brion Street, Vesper Street, and Morning Street. The project includes, but, is not limited to the following items: 1. Providing approximately 4,000 LF of storm drain and sewer piping and associated manholes; 2. Installation of stormwater treatment systems. 3. Surface restoration including full depth pavement from curb to curb, sidewalks, and vegetated areas. 4. Vehicular and pedestrian traffic control 5. Coordination with natural gas replacement by Until and coordination with abutting projects. 6. This project will be a blend bid with the Portland Water District. Water main work will include water main renewal from Mountfort Street to Morning Street.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents