Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Local Paving Project
Infrastructure
Post-Bid
Iron Mountain, MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Ottawa & Black River Campground Road Reconstruction
Term Contract
Results
$500,000 to $1,000,000 est. value

2022 Breitung Avenue Cold In Place Project
Alteration
Post-Bid
Iron Mountain, MI

Sturgeon River Bridge Rehabilitation
Infrastructure
Results
$563,500 CJ est. value
Foster City, MI 49834

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Hot Mix Asphalt Overlay and Pavement Markings on Upper Pine Creek Road
Infrastructure
Results
$189,000 est. value
Iron Mountain, MI 49801

Request for Proposal - School Safety Grant Projects
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$900,000 CJ est. value
Iron Mountain, MI 49801

East Pipeline Culvert Replacement Project
Infrastructure
Results
$113,000 CJ est. value
Felch Township, MI 49834

Bridge Rehabilitation Includes Remove and Replace Deck Wearing Surface, Replace Waterproofing Membrane, Deck Patching, Replace Deck Drains - County Road 573
Infrastructure
Post-Bid
$279,000 CJ est. value
Loretto, MI 49892

City of Iron Mountain 2022 Local Paving Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Iron Mountain, MI 49801

Sanitary Sewer Improvements Project
Demolition, New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Sagola Township, MI 49815

Kwik Trip #1256 / Iron Mountain
New Construction, Infrastructure - 9,176 SF
Post-Bid
$3,000,000 CJ est. value
Iron Mountain, MI 49801

Last Updated 12/08/2022 07:02 PM
Project Title

North Wells Grade Road Improvements

Physical Address View project details and contacts
City, State (County) Sagola Township, MI 49831   (Dickinson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $48,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to 1.0 mile of state forest roads generally consisting of Widen, ditch, shape, and level the existing subgrade roadbed using existing materials along the roadbed to a width of not less than 16'-0" Install 4 Equalization Culverts, Culvert material to be double wall with interior smooth surface All Equalization Culverts installed are 18" x 30'. All Equalization Culverts to have riprap (minimum size of 4"-6" diameter) placed at each end of culvert within 24 hours of installation. Cap segment area with pit run gravel at a minimum of 6" thick. Final shaping, leveling, and capping of the roadbed should result in drainage off the roadbed to maintain an approximate 16'-0" wide roadway after pit-run gravel is placed on all segments.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents