Project Title | CBJTC Barracks 2019 and 2017 Renovations |
Physical Address | View project details and contacts |
City, State (County) | Starke, FL (Bradford County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $300,000 to $350,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of Barracks Buildings 2019 and 2017 to include the following: Exterior - Inspect and repair soffit, fascia and drip edge as necessary. Install 4" x 36" high split face concrete block wainscot with concrete cap around perimeter of building. Clean and prepare existing block walls for wainscot and stucco. Provide adequate foundation for wainscot. Replace any damaged plywood as necessary with pressure treated sheathing, furred out even with adjacent concrete block wall. Install appropriate waterproof membrane and wire lath to receive stucco. Install stucco from top of new cap to soffit. Furnish and install new Solid Core Steel doors and new Best Lever Handle Hardware and Cores per CBJTC criteria. Remove existing screen doors and fill in hinge recesses on frame prior to paint. Replace all windows with new vinyl framed, fixed, insulated, low-e windows. Install flashing under windows over the precast cap. Inspect all exterior mechanical equipment and service/repair/replace as necessary. Color scheme to match building #2023. Interior - Furnish and install spray foam insulation to the bottom of the roof deck, minimum R30 or higher. Remove any existing shelving and associated hardware (diagonal roof bracing to remain). Install 1 5/8" metal framing on inside of exterior walls. Install 1 1/2" rigid foam insulation, and 5/8" GWB. Finish will be level 5. Extend all data, power outlets and switches flush with new GWB. Patch ceiling as needed. Furnish and apply new ceiling paint and interior wall paint. Remove all flooring (VCT) and patch all cracks in slab and seal concrete slab. Furnish and install new Hollow Core Steel doors and frames at both interior door locations. Provide lockset in accordance with CBJTC design criteria. Furnish and install new solid surface window sills, to be approved by CBJTC. Furnish and install 2" white plastic window blinds. | ||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |