Similar Projects
Sarasota's Bath and Racquet Club
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Sarasota, FL 34231

Worth It Living Time Share/Vacation Club Community
New Construction
Conception
Kissimmee, FL 324747

Dezerland Action Park - Master Plan
New Construction
Design
Orlando, FL 32819

Diesel Wynwood
New Construction, Build-Out - 150,000 SF
Design
$58,000,000 est. value
Miami, FL

A.D. Harris Gym Renovations
Renovation
Bidding
Panama City, FL

Miami Fitness Center and Locker Room Build Out
Renovation - 3,000 SF
Bidding
Miami, FL 33178

South Pointe Towers - Gym Renovation
Renovation - 3,100 SF
Post-Bid
Miami, FL 33139

EOS Fitness of Lutz
New Construction - 40,123 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Lutz, FL 33559

Construct Outdoor Fitness Facility
New Construction
Results
$250,000 to $500,000 est. value
Homestead, FL 33039

South Ormond Neighborhood Center Gymnasium Expansion
Addition
Results
Ormond Beach, FL

Sur Club
New Construction - 327,856 SF
Construction
$37,500,000 est. value
Saint Petersburg, FL

Water Pointe
New Construction - 1,277,564 SF
Construction
$7,140,000 est. value
Jupiter, FL 33477

Eos Fitness
New Construction
Pending Verification
Lutz, FL

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

EOS Fitness
Renovation - 41,732 SF
Conception
$2,200,000 est. value
Boca Raton, FL 33428

Last Updated 05/27/2021 09:27 AM
Project Title

Premier Martial Arts

Physical Address View project details and contacts
City, State (County) University Park, FL 34201   (Manatee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Bids by Invitation.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, 1,321 SF Build-Out.
Division 02 - Existing Conditions, Existing Material Assessment, Existing Concrete Assessment.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents