Similar Projects
Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Barnum, MN 55707

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Resurfacing - TH 40
Infrastructure
Design
$2,700,000 CJ est. value
Montevideo, MN 56265

Ess Lot & Ernst Home (Chaska Yards)
Demolition, New Construction, Renovation, Infrastructure
Design
$1,500,000 CJ est. value
Chaska, MN 55318

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

North 4th Street
Infrastructure
Bidding
$1,128,298 CJ est. value
Mankato, MN 56001

DNR2 Aitkin State Forest Road Shovel Excavate
Infrastructure
Post-Bid
Aitkin, MN

Northwest 2022 Site Prep & Crop Tree Release
Infrastructure
Post-Bid
Backus, Bemidji, Park Rapids, Warroad, MN 56470

Silver Lake Water Quality Improvement
Infrastructure
Results
$128,936 CJ est. value
Chanhassen, MN 55317

ISD 11 High School Multipurpose Fields
New Construction, Infrastructure
Results
Anoka, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Northstar Marketplace Retail Building
New Construction, Infrastructure - 7,200 SF
Construction
$1,900,000 CJ est. value
Ramsey, MN 55303

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Guardian Angels Block 42 Redevelopment
New Construction, Renovation, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Chaska, MN 55318

Highway 284 Residential Development
New Construction, Infrastructure
Conception
$125,600,000 CJ est. value
Waconia, MN 55387

Last Updated 02/24/2023 04:07 PM
Project Title

Wastewater Treatment Facility Primary - Digester Cover Replacement

Physical Address View project details and contacts
City, State (County) Red Wing, MN 55066   (Goodhue County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $942,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Wastewater Treatment Facility, Red Wing, Minnesota Digester Cover Installation Project. Existing fixed cover, mixer and associated equipment demolition New fixed cover, mixer and associated equipment installation Roof replacement Piping and valves Electrical, controls, instrumentation Lighting improvements Major components of the Work include: Installation of radial beam fixed cover, draft tube mixers and appurtenances already procured by City of Red Wing for the Primary Digester in Red Wing, MN. Process piping replacement, roof replacement of Digester Building and electrical work are also included in the project. 1. Demolition of existing primary digester cover and mixing system, disposal off site. 2. Contractor shall provide grading to allow for tank cover construction next to existing tank and provide necessary traffic control. Contractor to re-grade after cover installation to return to preexisting conditions. 3. Contractor shall provide temporary fencing as necessary during the cover assembly. 4. City is responsible for coordinating with the railroad for work inside railroad right of way including necessary permits. 5. Welding inspection will be done following digester cover assembly by Owner's inspector. Contractor is responsible for any corrections to welding following inspections. 6. The cover and mixing system has been procured by the Owner from Envirodyne Systems, Inc. 7. The Primary Digester is the south-eastern most tank in the Digester Complex (which also contains primary clarifiers on the west side of the complex. 8. It is important to note that on the west side of the Primary Digester tank cover, the existing walkway is mounted on top of the digester tank wall. This limits the available space for mounting cover supports on the top of digester tank wall. The equipment procurement Manufacturer ("Seller") is including modified cover supports in this area to be installed by Contractor. See photos in appendix for reference. 9. Primary digester tank cleaning as described in technical specifications herein. 10. Contractor to coordinate scheduling of structural inspection (by Engineer) of digester tank walls immediately following completion of cleaning work while the digester cover is off of the tank. 11. Concrete patching as necessary following structural inspection. 12. Installation of new sludge suction and recirculation piping inside primary digester. This will require core drilling and adequately sealing of penetrations. 13. Installation of new fiberglass biogas piping inside tank and inside building. This biogas piping is to be supported underneath the interior of fixed radial beam digester cover. 14. Construction and installation of fixed, radial beam digester cover, draft tube mixing system and related appurtenant equipment for the Primary Digester at the Red Wing, MN WWTF as described in the technical specifications herein. 15. Contractor shall apply coatings and cover insulation as described in the specifications herein. 16. Coatings inspection will be done during digester cover coating application by Owner's inspector. Contractor is responsible for any corrections to coatings and welding following inspections. 17. Building roof replacement The Work will be substantially completed by or before October 30, 2023 ; final completion- on or before December 31, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents