Similar Projects
RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Repair and Replace Water Supply System Rebid
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Monee, IL 60449

Romeo Crossing Community Park
Infrastructure
Bidding
$300,000 CJ est. value
Romeoville, IL 60446

Public Parkway Tree Planting 2022 Fall Program
Term Contract
Sub-Bidding
Homer Glen, IL 60491

Residential Decorative Street Lighting - Phase 5
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Romeoville, IL 60446

BHS South Lot Rehabilitation
Post-Bid
Romeoville, IL

W/Hot-Mix Asphalt Surface
Post-Bid
Joliet, IL

Lake Strini Improvements.
Results
Romeoville, IL

Lake Strini Improvements.
Results
Romeoville, IL

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Patching Work for Various Types of Concrete Curb and Gutter and Some Concrete Pavement
Infrastructure
Bidding
$400,000 CJ est. value
Joliet, IL 60436

Thermoplastic Line
Post-Bid
Joliet, IL

RR-21-4563 Veterans Memorial Tollway (I-355) Plaza 99 Spring Creek Modifications
Results
IL

Construction Variable Width Pavement
Post-Bid
Bolingbrook, IL

Last Updated 08/08/2022 09:51 AM
Project Title

Pavement Reconstruction

Physical Address View project details and contacts
City, State (County) Homer Glen, IL 60491   (Will County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $9,988,295 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement reconstruction, storm sewer, curb and gutter, sidewalks, retaining wall, traffic signal modernization and lighting on Bell Road from 151st Street to 159th Street in Homer Glen. Region 1 District 1 Federal Project # 3ZRU(835) County(s) Will Key Route(s) FAP 356 Marked Route(s) Bell Road Section(s) 99-00147-07-FP State Job #(s) C-91-156-15 PPS #(s) 1-21900-0000 Completion Date : August 30, 2024 Plus 10 Working Days Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 15, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 004 - Pavement Reconstruction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents