Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Kennedy Avenue Streetscaping
Infrastructure
Post-Bid
East Chicago, IN 46312

Saint John Community Crossing`s Road Improvements
Results
Saint John, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Rise and Shine Car Wash - Crown Point
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crown Point, IN 46307

Savannah Cove Subdivision
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Merrillville, IN 46410

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Hohman Avenue Roadway Reconstruction and Rimbach Street Realignment
Infrastructure
Post-Bid
Hammond, IN 46322

Last Updated 04/10/2023 10:06 AM
Project Title

2023 Project Rebid Courtyard and Parking Lot Drainage and Improvements

Physical Address View project details and contacts
City, State (County) Munster, IN 46321   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $348,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

2023 Project Rebid Courtyard and Parking Lot Drainage and Improvements Munster High School 8808 Columbia Avenue Munster, Indiana 46321 A single General Contract to a General Contractor for all trades and scope of work included in the Project Bid Documents. Bidders shall ensure bid delivery. For bids being personally delivered, bidders are to follow the procedures at the Administration Center on the day of bids. Bidders shall ensure and confirm that their bids have been received by the Owner. Architect's Information: 1. J. Lake Architecture & Design 129 Quartermaster Court Jeffersonville, IN 47130 Owner reserves the right to reject any and all bids and to waive informalities and irregularities. All questions shall be directed to the Architect as follows: James Lake, AIA J. Lake Architecture & Design 502-802-8797 jamie.lake@jlakearch.com All bidders are responsible for all costs of any desired downloaded files and printed hard copies of drawings and/or specifications directly from the reprographics company at their cost for download, printing, and associated shipping and handling charges. All bidders are required to review, download, print, or otherwise obtain an entire and complete set of Construction Documents, including all Drawings, Specifications, and Addenda posted to the online plan room. The Architect and Engineers retain all copyright to all bid documents, both in digital and hard copy form, as instruments of their professional service and a product of their work. No bidder, supplier, or any other person or entity is permitted to use these documents for any purpose other than preparing a bid for this Project. All documents are on file at the offices of the Owner and the Architect. All questions shall be directed to the Architect as follows: James Lake, AIA J. Lake Architecture & Design 502-802-8797 jamie.lake@jlakearch.com B. All questions shall be submitted in writing via email. BID SECURITY A. Bid security shall be submitted with each bid in the amount of five percent (5%) of the total bid amount, including the Base Bid and all additive Alternate Bids. B. Bid security may be in the form of cashier's check, certified check, money order, or bid bond. C. The Base Bid may be held for a period of thirty (30) days before awarding the Contracts. D. Should a successful bidder withdraw their bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of their bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as a penalty. BONDING A. Successful bidder shall provide a Performance Bond and Payment Bond in the amount equal to one hundred percent (100%) of the total Contract Sum. B. Bonds shall be from a surety company approved to conduct business in the state where the work is being performed. C. Bonds shall remain in full force and effect for a period of one (1) year after the date of final acceptance of the work. D. All costs for the Performance Bond and Payment Bond shall be included in the Base Bid price. It is the responsibility of all bidders to obtain all information and updates from the online plan room and reprographics company listed herein TIME OF COMPLETION A. The Owner intends to award the Project at their Board Meeting on Monday, March 13, 2023. B. Upon award, the Architect will issue a Notice to Proceed on behalf of the Owner. C. Upon receipt of the Notice to Proceed, the successful bidder shall begin the Work, file for the necessary approvals and permits, submit the required project documentation to the Architect, and prepare to mobilize on site. D. Summer Break 2023: The Contractor shall begin all work onsite beginning at the end of the school year and continue throughout the Summer Break, currently scheduled for May 25, 2023 through August 1, 2023. The Contractor will have full access to all areas of the school, courtyard, and parking lot, and at all times desired by the Contractor. E. Contractor shall achieve Substantial Completion of the parking lot by August 1, 2023. The intent is to complete the Work in the parking lot at the front of the school for practical use by the Owner prior to the return of students to school for the start of the Fall Semester 2023. This includes the excavations and installation required for the subsurface storm piping and structures, and the resurfacing and restriping of the asphalt surface. F. Contractor shall achieve Substantial Completion of the courtyard drainage by August 1, 2023. The intent is to complete the Work of the storm piping in the courtyard prior to the return of students to school for the start of the Fall Semester 2023.This includes the boring of the storm pipe between the courtyard and the parking lot, and the excavations and installation required for the subsurface storm piping and structures in the courtyard. G. Contractor shall achieve Substantial Completion of the courtyard surface by September 1, 2023. The courtyard does not need to be usable for students at the start of the Fall Semester 2023. This work remaining after school starts includes the installation required for the surface paver system and finalization of the work in the courtyard. H. For purposes of timing, if the Contracts are not awarded at the Board Meeting indicated, the Contract Time will be extended accordingly.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents