Similar Projects
New Town Hall
New Construction - 9,000 SF
Design
Summerfield, NC

Structural Repairs Mann Hall
Term Contract
Bidding
$3,000,000 to $5,000,000 est. value
Raleigh, NC 27607

Renovation of the Trotter Recreation Center
Renovation
Bidding
Greensboro, NC 27407

Temporary Services - Craven County Courthouse/Eoc/Annex Renovation
Renovation
Post-Bid
New Bern, NC 28560

Pineville Town Hall and Library
Post-Bid
Pineville, NC 28134

Design-Build of Princeville Town Hall Hazard Mitigation and Rehabilitation
Renovation - 6,000 SF
Results
Tarboro, NC

Wake County Courthouse 3rd Floor County Attorney's Suite
Renovation
Results
Raleigh, NC 27600

Historic Union County Courthouse Restoration and Renovation - Phase 1
Renovation
Construction
Monroe, NC 28112

Brunswick County Courthouse Addition and Renovation Project
Renovation, Addition - 117,450 SF
Construction
Less than $12,000,000 est. value
Bolivia, NC 28422

Historic Courthouse Renovations
Renovation
Bidding
Currituck, NC 27929

Armory National Guard Building
New Construction
Post-Bid
Snow Hill, NC 28580

Plaza Repair Project - Wake County Courthouse
Results
Raleigh, NC

Cabarrus County Courthouse - GMP2 Package
Construction
Concord, NC 28025

Ricks Hall 2nd Floor Renovations
Renovation
Post-Bid
Less than $5,500,000 est. value
Raleigh, NC 27600

Lincoln County Courthouse
Results
Lincolnton, NC 28092

Reported 11/17/2021 12:00 AM
Project Title

Courthouse Elevator Contactors

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a set of contacts that will allow the elevator control panel to communicate with the generators. Currently all six of the Courthouse elevators are on generator power, but there is not communication between the elevator control panel and generator to notify the elevators when the power is switched from normal power to generator power. The contractor is to run conduit and pull wire from ATS (located on the lower level) to Elevator Control Panel (located on the roof). The work is as follows: Elevators 1 through 4: 1. 1 pair of normally closed contactors. 2. 1 pair of normally open contactors w/ 20 second delay. Elevator 5: 1. 1 pair of normally closed contactors. 2. 1 pair of normally open contactors w/ 20 second delay. Elevator 6: 1. 1 pair of normally closed contactors. 2. 1 pair of normally open contactors w/ 20 second delay.

Details

Capitol/Court House/City Hall, Renovation.
Division 14 - Conveying Equipment.
Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents