Similar Projects
Wastewater Treatment Facility Primary Clarifier No - 2
Renovation
Post-Bid
$2,300,000 est. value
Watertown, SD

Wastewater Treatment Facility Improvements - Phase I
New Construction
Results
Huron, SD

Aberdeen WRF Biosolids Dewatering
Renovation
Results
Aberdeen, SD

WWTF Improvements - Phase 1 Golf Course Force Main and WWTF Repairs
Results
$910,000 est. value
Custer, SD

Furnishing of Wastewater Treatment Equipment
Post-Bid
Pierre, SD

WWTF Improvements - Phase 1B Building Modifications
Renovation
Results
$770,000 est. value
Custer, SD

2021 Hot Springs Wastewater Treatment Facility Digester Cover Replacement
Results
Hot Springs, SD

Reported 07/15/2021 12:00 AM
Project Title

Wastewater Treatment Improvements

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD   (Stanley County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installing Contractor assigned wastewater equipment (MBBR, Blowers, Aeration, and UV Disinfection Equipment) and furnishing and installing approximately 4,500 feet of 3-inch, 4-inch and 10-inch force main, 1,800 feet of 12-inch and 16-inch gravity sewer, two 18’x18’ cast in place concrete tanks, precast concrete buildings, manhole & concrete structures, plug valves, and electrical work, dewatering, testing, site work, and cleanup and all appurtenances as required by the Project Drawings, Specifications, and Contract Documents. The project is located one (1) mile south of the City of Fort Pierre, South Dakota in Central South Dakota.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents