Similar Projects
Metro Center - Parcel C
New Construction
Design
Aurora, CO 80017

Big Sandy Park Improvements
New Construction
Bidding
Centennial, CO 80015

District Tennis Courts Repairs
New Construction
Post-Bid
Aurora, CO 80012

District Running Tracks Repairs
Infrastructure
Post-Bid
Aurora, CO 80012

Foxridge Park Improvements
Results
Less than $240,000 est. value
Centennial, CO 80122

2020 Foothills Neighborhood Park Improvements
Results
Littleton, CO 80127

Fitzsimons Village East - Mixed Use
New Construction - 549,315 SF
Construction
$10,000,000 CJ est. value
Aurora, CO 80011

Ida Park Improvements
Renovation
Post-Bid
$115,000 to $125,000 est. value
CO 80120

Packy Romans Park Improvement Project Phase 2
Results
Englewood, CO 80110

Foxhill Park Project
Results
$350,000 to $375,000 est. value

McMullen Park Playground Renovation
Results
$225,000 to $245,000 est. value
CO 80010

Englewood Parks Renovations
Results
Englewood, CO 80110

Pirates Cove Play Structure Improvement Project
New Construction
Results
Littleton, CO 80120

Berry Park Improvements
New Construction
Results
Less than $300,000 est. value
Littleton, CO 80121

Bobcat Park Improvements
New Construction
Results
Less than $300,000 est. value
Sheridan, CO 80110

Last Updated 09/03/2021 10:41 AM
Project Title

Red-Tailed Hawk Park - Phase III

Physical Address View project details and contacts
City, State (County) Aurora, CO 80016   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $425,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Red-Tailed Hawk Park – Phase III project involves construction of an additional parking lot. The project includes but is not limited to: 1. Earthwork 2. Erosion control 3. Concrete walks to connect the new parking lot to existing trails 4. Concrete curb and gutter 5. Concrete curb ramps for accessibility 6. Asphalt parking lot with appropriate striping and signage 7. Landscape improvements will be limited to re-seeding the native areas surrounding the new parking that will be disturbed during construction.

Details

Park/Playground, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents