Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

DFCM Construction - DWR Logan Fes Groundwater Wells Assessment
Bidding
$180,000 est. value
Logan, UT 84321

Ledges 1 and Tolman 4 Water Well Cathodic Protection System
Post-Bid
Saint George, UT

Mexican Hat SSD Well Improvements
Post-Bid
Mexican Hat, UT

Water System Drilling, Construction and Testing
Results
Heber, UT

F--New Westwater Well
Results
$100,000 to $250,000 est. value
Cisco, UT

South Well Chlorinator Upgrade 2020
Bidding
Grantsville, UT

Ras Pump System
Post-Bid
Provo, UT 84601

Milford Culinary Well Drilling Project 2019
Results
Less than $549,205 est. value
Milford, UT 84751

Drilling Rig and Services for Forge
Bidding
Milford, UT

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Water Treatment- Green Well
Post-Bid
Riverton, UT

Reported 02/28/2020 12:00 AM
Project Title

Construction of the Coldwater Well Improvement Project

Physical Address View project details and contacts
City, State (County) Mendon, UT 84325   (Cache County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes well site grading and preparation, construction of the Coldwater Well control vault and appurtenant pipes, valves, equipment, pipeline connection to the wellhead, and well site improvements; construction and installation the well`s electrical control panel and telemetry; construction of pump-to-waste discharge pipeline; construction of control panel, standby generator and electrical transformer concrete pads; site grading and surface improvements; and, perimeter fence and access gates.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents