Last Updated 12/30/2020 01:24 AM
Project Title

Demolition of Phase 1A _1B Houses (198 houses) TSTC Waco

Physical Address View project details and contacts
City, State (County) Waco, TX 76705   (McLennan County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of Phase 1A_1B Houses (198 houses) located in Waco, TX. A. The residences, in their entirety, shall be demolished including all footings, slabs, all porches, carports, driveways, and steps. All concrete directly associated with the residences shall be removed. B. Previous demolition projects that left concrete foundations and driveways intact shall be removed. C. Playground equipment located at the intersection of Maxwell Street and Chanute Street shall be removed along with all associated ground cover. D. All sidewalks, curbs, and approaches will remain intact. E. Remove all trees and shrubs that are unhealthy or are blocking work progress. Healthy trees that are not in the way of the demolition work should be protected and left in place. F. Install a six-foot chain link fence around the work area. G. All work shall be under the management of the Consultant. H. All waste manifests and load receipts shall be supplied to the Consultant's on-site supervisor daily. I.Texas State Technical College shall be responsible for reseeding the backfilled area. J. All vehicles shall travel the designated route on the TSTC campus to avoid interrupting the day to day activities on the campus. All demolition related traffic shall enter/exit the demolition site at the gate located at the intersection of Brook Avenue and Langley Drive and enter/exit the TSTC campus at the south end on Airline Road. K. If any HVAC units still contain freon, the contractor is responsible for the removal and disposal of the freon utilizing current regulation. L. The contractor is responsible for properly disposing of all appliances and contents left in the residences following all regulatory requirements from the State of Texas and the EPA.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents