Similar Projects
Bridge and Approaches - SH 6
Infrastructure
Conception
$3,557,360 CJ est. value
Altus, OK 73521

Bridge and Approaches - SH 6
Infrastructure
Conception
$3,557,360 CJ est. value
Altus, OK 73521

Sewer Line Rehabilitation for the Sewer System Repairs
Infrastructure
Design
$2,000,000 CJ est. value
Martha, OK 73556

Bridge and Approaches - SH 19
Infrastructure
Design
$11,756,126 CJ est. value
Blair, OK 73526

Outdoor Pool Removation / Remodel
Infrastructure
Bidding
$2,000,000 CJ est. value
Altus, OK 73521

Repair of Southeast Water Tower
Infrastructure
Bidding
$3,000,000 CJ est. value
Altus, OK 73521

Sewer Line Rehabilitation
Infrastructure
Post-Bid
$360,000 CJ est. value
Headrick, OK 73549

Sheet Metal Storage Building and Asphalt Paving Apron at the Jackson County Expo Center
New Construction, Infrastructure
Post-Bid
$462,000 CJ est. value
Altus, OK 73521

Slabjacking and Subsealing Services
Infrastructure
Results

Water System Improvements - Phase III: Water Distribution System Improvements
Infrastructure
Results
$629,494 CJ est. value
Altus, OK 73521

Repair of Northwest Water Tower
Infrastructure
Bidding
$300,000 CJ est. value
Altus, OK 73521

B1029 Maintain-Repaint Taxiways
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Altus, OK 73523

Repair of Southwest Water Tower
Infrastructure
Bidding
$400,000 CJ est. value
Altus, OK 73521

New 16-inch Water Main
Infrastructure
Bidding
$500,000 CJ est. value
Altus, OK 73521

Downtown Event Park Phase 1
Infrastructure, Renovation
Bidding
$600,000 CJ est. value
Altus, OK 73521

Last Updated 03/11/2023 07:05 AM
Project Title

Pedestrian Improvements (Sidewalks) - US-62

Physical Address View project details and contacts
City, State (County) Duke, OK 73532   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $816,630 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Sidewalks) Us-62: From 0.5 Miles West of the Sh-34 Junction, Extend East in the Town of Duke. Project Length = 0.286 Mile Counties: Jackson Calendar Days : 120 Questions and comments will be accepted until Febraury 24, 2023. Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 745 - Pedestrian Improvements (Sidewalks) - US-62

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents