Similar Projects
Plant 83
New Construction, Demolition - 100,000 SF
Conception
$20,000,000 est. value
Baltimore, MD 21211

Plant 83
New Construction, Demolition - 100,000 SF
Conception
$20,000,000 est. value
Baltimore, MD 21211

Roland Avenue Mixed Use
Renovation
Design
Baltimore, MD 21211

Roland Avenue Mixed Use
Renovation
Design
Baltimore, MD 21211

Egg Shaped Digester Rehabilitation Improvements at the Back River Wastewater Treatment Plant
Infrastructure
Bidding
$80,000,000 CJ est. value
Baltimore, MD 21224

West Campus Infrastructure - Parking/Road/Security Deferred Maintenance (Rebid)
Infrastructure
Bidding
$10,000,000 CJ est. value
Baltimore, MD 21218

Eddie's Market of Roland Park
Renovation
Post-Bid
Baltimore, MD 21210

Popeyes
Renovation - 2,870 SF
Post-Bid
Baltimore, MD 21202

Hillen and Pen Lucy North Neighborhood Water Main Replacements
Infrastructure
Results
$18,470,355 CJ est. value
Baltimore, MD 21202

Repaving Utility Cuts and Sidewalk Restoration at Various Locations
Infrastructure
Results
$7,413,850 CJ est. value
Baltimore, MD 21202

Harbor East Residential Tower
New Construction
Construction
$100,000,000 est. value
Baltimore, MD 21202

Harbor East Residential Tower
New Construction
Construction
$100,000,000 est. value
Baltimore, MD 21202

North Avenue Mixed-Use Development / Baltimore
New Construction, Infrastructure - 41,450 SF
Pending Verification
$200,000,000 CJ est. value
Baltimore, MD 21217

North Avenue Mixed-Use Development / Baltimore
New Construction, Infrastructure - 41,450 SF
Pending Verification
$200,000,000 CJ est. value
Baltimore, MD 21217

Camden Street Skywalk Removal
Demolition, Alteration
Conception
Less than $3,508,000 est. value
Baltimore, MD 21201

Last Updated 09/16/2022 09:03 AM
Project Title

Expression of Interest (EOI) Master Developer for State Center Complex

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21201   (Baltimore City County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service, Office, Retail, Shopping Center/Strip Mall, Site Development
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,500,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 16, 2022, the Maryland Stadium Authority is no longer involved with this project. The site is in the process of being transferred to the city of Baltimore and they will be determining the best use for the site in the future. *The original solicitation is listed below for reference. --- The Maryland Stadium Authority (MSA) in collaboration with the Maryland Department of General Services (DGS) is seeking an Expression of Interest (EOI) from experienced firms qualified to lead the redevelopment of the State Center Complex (State Center) in Baltimore City. The EOI is the first step in a multi-step process to select a master developer for the State Center site. MSA intends to invite qualified respondents to the EOI to respond to a Request for Information (RFI). The RFI will serve as the basis for establishing a shortlist of firms that will be invited to respond to a Request for Proposal (RFP). State Center is a 28-acre government complex located in the Cultural Center/Midtown Baltimore area of Baltimore City. The site is bounded by Martin Luther King (MLK) Jr. Boulevard along the southerly boundary, Howard Street on the eastern boundary,Dolphin Street on the northerly boundary and Madison Avenue on the western boundary. Eutaw Street which extends southeasterly from Dolphin Street to MLK Jr. Blvd. bisects the site. The historic Fifth Regiment Armory building is located within the site boundaries. The site has access to the following modes of transportation. Highway/major thoroughfare via (1) Martin Luther King, Jr. Boulevard which provides direct access to the west side and downtown, (2) a direct connection to I-83 which provides north-south access to downtown, business/population centers north and (3) I-695 which loops the city. Subway via a station located within the site. Light rail via a station located adjacent to the site. Train via Penn Station to the northeast which provides inter-city rail connections including all of the Penn Line trains to Washington,D.C. Respondents shall acquaint themselves with the information contained in previous development studies, recently passed legislation and community forums associated with the redevelopment of State Center. This includes, but is not limited to, the following. The Baltimore State Center Site Alternative Land Use Study released by MSA in January 2018 The Expression of Interest response should include the following: 1. A letter of interest; 2. The name, title, phone number and e-mail address of the respondent's singlepoint of contact; 3. A brief narrative highlighting the firm's qualifications and/or capabilities including relevant experience; 4. A brief narrative describing how the firm would accomplish the project. Questions concerning this solicitation are to be submitted to:Al Tyler Maryland Stadium Authority 351 W. Camden Street, Suite 300 Baltimore, Maryland 21201 Office Phone: (410) 223-4150 e-mail: atyler@mdstad.com The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents