Similar Projects
Houston Avenue Trail - City of Temple
Infrastructure
Conception
Less than $600,000 est. value
Temple, TX 76501

Fy 21 Micro-Surfacing Package
Design
$500,000 to $1,000,000 est. value
Fort Hood, TX

Fort Hood Paving ID/IQ
Term Contract
Bidding
$100,000,000 to $250,000,000 est. value
Fort Hood, TX

FM 436 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,891,533 est. value
Belton, TX 76513

Deployment Readiness Reaction Field (Drff) Repairs and Improvements Fort Hood, TX
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Hood, TX

HEB plus! Killeen #3 - Parking Lot
Demolition
Post-Bid
Killeen, TX 76542

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Results
Nolanville, TX

Resurface Roadway
Results
$2,590,963 est. value
TX

SH 195 - Hazard Elimination and Safety
Infrastructure
Bidding
$536,740 est. value
Killeen, TX 76549

Slurry Seal Services
Term Contract
Post-Bid
Killeen, TX

Central Fire Station Pavement Reconstruction
Results
Harker Heights, TX

Little River Street Improvement Project
Infrastructure
Post-Bid
Little River-Academy, TX 76554

2021 Street Overlay Project
Results
Less than $586,230 est. value
Belton, TX

HA AMPS 1 and 2 Front Entry Resurfacing
Infrastructure
Post-Bid
Temple, TX

Asphalt Overlay and Millings Services
Term Contract
Results
$5,896,323 est. value
Killeen, TX

Reported 06/29/2022 02:13 PM
Project Title

14th Street - Connector to Ferguson Park (Crestview District) - City of Temple

Physical Address View project details and contacts
City, State (County) Temple, TX 76501   (Bell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected May 2025
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 14th Street project consists of roadway improvements for 14th Street from Adams Avenue to Avenue H within the Ferguson Park Neighborhood Planning District. The proposed project will include reconstruction of a 2-lane roadway with curb and gutter, landscaping, irrigation, lighting, street trees, and waterline improvements. 14th Street is located along the western edge of the Ferguson Park Neighborhood Planning District providing vehicular access from Adams Avenue to Avenue H. Currently, 14th Street is a narrow roadway with no pedestrian improvements. Roadway improvements will provide a safe and accessible route for motorists to reach key destinations in East Temple. The project is included in the city's 2022-2028 Capital Improvement Program (CIP). As of June 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents