Similar Projects
Azalia Solar Farm / Milan Township
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Toledo Street Improvements
Infrastructure
Bidding
$350,000 CJ est. value
Dundee, MI 48131

Toledo Street Improvements
Infrastructure
Bidding
$350,000 CJ est. value
Dundee, MI 48131

Main Street Resurfacing Project
Infrastructure
Post-Bid
Milan, MI

Bridge Support - Epoxy and Healer Sealer
Renovation, Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1.62 Mi of Hot Mix Asphalt Cold Milling
Infrastructure
Results
MI

ProMedica Monroe Regional Hospital / Frenchtown Charter Township
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Monroe, MI 48162

ProMedica Monroe Regional Hospital / Frenchtown Charter Township
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Monroe, MI 48162

High School Staff Parking Lot / Firestone Drive Asphalt Replacement
Infrastructure
Post-Bid
$300,000 est. value
MI

0.01 MI of Culvert Replacement Includes Roadway Reconstruction, Water Main Relocation and Approach Work on US-24
New Construction, Infrastructure
Results
MI

Monroe Consolidated Drain Improvements
New Construction, Infrastructure
Post-Bid
$2,342,874 CJ est. value
Monroe, MI 48161

2022 Cold In-Place Recycling
Infrastructure
Results
$251,900 est. value
Monroe, MI

Last Updated 03/11/2023 08:04 AM
Project Title

Bridge Replacement Removal and Replacement With 30-inch Steel Tub Girders and Cast-in-place Concrete Slab and Approach Work on Finzel Road

Physical Address View project details and contacts
City, State (County) Ash Township, MI 48117   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,514,117 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge replacement removal and replacement with 30-inch steel tub girders and cast-in-place concrete slab and approach work on Finzel Road over Stony Creek, Monroe County. This is a Local Agency project. Control Sec Job No Federal No BFPO 58000 212307A 23A0147 Net classification required for this project is 1657 Fa MI DOT - 2303 239 - Bridge Replacement Removal and Replacement With 30-inch Steel Tub Girders and Cast-in-place Concrete Slab and Approach Work on Finzel Road Letting No- 230203 039

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents