Similar Projects
North York Widening #1 (Exit 19)
Infrastructure
Conception
$187,200,000 CJ est. value
Springfield Township, PA 17403

North York Widening #1 (Exit 19)
Infrastructure
Conception
$187,200,000 CJ est. value
Springfield Township, PA 17403

Red Lion Avenue Bridge
Infrastructure, Renovation
Design
$1,905,500 CJ est. value
Felton, PA 17322

Red Lion Avenue Bridge
Infrastructure, Renovation
Design
$1,905,500 CJ est. value
Felton, PA 17322

2022 Street Projects
Infrastructure
Post-Bid
Jacobus, PA 17407

2022 Street Projects
Infrastructure
Post-Bid
Loganville, PA 17403

74/24 Curb, Sidewalk, Storm Sewer, and Street Improvements
Infrastructure
Results
Red Lion, PA

2021 Bridge Maintenance Project
New Construction
Results
$120,000 est. value
PA

2022 Roadway Improvements - Contract No. 1
Infrastructure
Construction
$311,998 CJ est. value
Penn Township, PA 17331

2022 Roadway Improvements - Contract No. 1
Infrastructure
Construction
$311,998 CJ est. value
Penn Township, PA 17331

Freedom Square
New Construction, Infrastructure - 185,000 SF
Pending Verification
$800,000,000 CJ est. value
West York, PA 17404

Freedom Square
New Construction, Infrastructure - 185,000 SF
Pending Verification
$800,000,000 CJ est. value
West York, PA 17404

Detters Mill Road Bridge
Demolition, New Construction, Infrastructure
Conception
$1,118,570 CJ est. value
Dover, PA 17315

North York Widening #2 (Codorus Creek Bridge)
Infrastructure
Design
$151,236,000 CJ est. value
Springfield Township, PA 17403

2022 Paving Project
Infrastructure
Post-Bid
$1,200,000 est. value
New Freedom, PA

Last Updated 03/03/2023 12:07 AM
Project Title

Harmony Grove Rd Br PM

Physical Address View project details and contacts
City, State (County) Dover, PA 17315   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $2,865,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Preservation on SR 4014, Harmony Groove Road over Conewago Creek, Dover Township. As of March 03, 2023, the project is in future development stage. Anticipated letting date is March 14, 2024. PennDOT - Harmony Grove Rd Br PM *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents