Similar Projects
RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Sundance Meadows
New Construction, Infrastructure
Conception
$185,000,000 CJ est. value
Nine Mile Falls, WA 99026

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

Plastic Surgery Northwest Remodel
Addition, Demolition, Build-out, Infrastructure - 5,000 SF
Design
$1,800,000 CJ est. value
Spokane, WA 99202

Improvement of Lincoln Road From Market Street to Crestline Street
Infrastructure
Bidding
$845,000 CJ est. value
Spokane, WA 99217

Improvement of Lincoln Road From Market Street to Crestline Street
Infrastructure
Bidding
$845,000 CJ est. value
Spokane, WA 99217

2022 Felts Field Site Improvements
Infrastructure
Post-Bid
Spokane, WA 99212

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Doris Morrison Learning Center Building Site and Trail
Renovation, Infrastructure - 6,000 SF
Results
WA

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Results
Less than $300,000 est. value
Spokane, WA 99202

Spokane International Airport Concourse C Trex - Bid Package No. 20 - General Construction
Addition, LEED Certification, Renovation, Infrastructure
Construction
$15,950,000 CJ est. value
Spokane, WA 99224

Pines Road Apartment Complex
New Construction, Infrastructure - 36,800 SF
Pending Verification
$4,000,000 CJ est. value
Spokane Valley, WA 99216

Rosewood Commercial Park
New Construction, Infrastructure - 36,000 SF
Pending Verification
$3,900,000 CJ est. value
Spokane, WA 99217

I-90/Lindeke St Crossing - Bridge Deck Repair
Infrastructure, Renovation
Conception
$689,000 CJ est. value
Spokane, WA 99201

2021-23 ER Region Wide Basic Safety - Signing
Infrastructure
Design
$782,000 CJ est. value
Spokane, WA 99201

Last Updated 02/27/2023 04:05 PM
Project Title

Cure-In-Place Pipe (CIPP) 2020

Physical Address View project details and contacts
City, State (County) Spokane, WA 99201   (Spokane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,354,009 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of the following quantities of cure-in-place pipe (CIPP): 8" - approx. 4,300 LF, 10" - approx. 2,000 LF, 12" - approx. 3,500 LF, 14" - approx. 500 LF, 20" - approx. 1,200 LF, 24" - approx. 2,300 LF for an approximate total of 13,800 LF. Also included are side sewer reconnections and approximately 20 service connection repairs. The City of Spokane, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within FIVE (5) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTYFIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. Range: $1,500,000.00 to $1,750,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents