Similar Projects
Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Upgrade Domestic Hot and Cold Water Systems
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
San Diego, CA 92161

Electrical Motors Overhaul Services
Term Contract
Bidding
San Diego, CA 92106

Design of Otay 2nd Pipeline St Replacement Ph 5
Infrastructure
Post-Bid
$200,000 to $2,500,000 est. value
San Diego, CA 92101

Chilled Water System
Infrastructure
Post-Bid
San Diego, CA

Recycled Air/Vac & Drain Replacement Project
Alteration
Results
$50,000 est. value
Fallbrook, CA 92028

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Results
$1,310,000 est. value
Poway, CA 92064

Pipeline 5 Relining, North Twin Oaks Valley Road to Crossover Pipeline Turnout
Infrastructure
Bidding
$27,000,000 est. value
San Diego, CA

Construction Management for Alvarado 2nd Pipeline
Term Contract
Post-Bid
$300,000 to $350,000 est. value
San Diego, CA

SDIA - Airport Administration Building - Underground Utilities
Infrastructure
Results
San Diego, CA 92108

Scripps Ranch Improvement 1
Infrastructure
Bidding
$5,930,000 est. value
San Diego, CA

Job Order Contract (Joc) Pipeline
Infrastructure
Post-Bid
$40,000,000 est. value
San Diego, CA

AC Water & Sewer Group 1052
Infrastructure
Results
$14,610,000 est. value
San Diego, CA 92101

Gordon Hill Road Pipeline Replacement Project
Infrastructure
Bidding
$2,450,000 est. value
Valley Center, CA 92082

Last Updated 06/28/2022 10:00 AM
Project Title

Pure Water Program (PWP) Morena Conveyance South & Middle and Morena Conveyance Bike Lanes

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $116,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Morena Conveyance South: The Morena Conveyance South project includes the installation of 48” wastewater forcemain pipeline (approx. 17,404 LF) and 30-inch Welded Steel Pipe brine centrate/conveyance pipeline (approx. 17,840 LF) from the Morena Pump Station located at the corner of Sherman and Custer Streets east along Sherman Street, north along Morena Boulevard, east on Milton Street, North on Chicago Street, east on Jellett Street, north on Denver Street and east on Clairemont Drive until Iroquois Avenue, and associated appurtenances Morena Pipelines: The Morena Pipelines project includes the removal and replacement of 16” cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36” Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipelines move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Phase 1 North City Pure Water Project, Morena Conveyance (BL): This project will install Class II (bike lanes) with buffer, bicycle loops, Sharrows and signage as per plan on the following roadway: Clairemont Dr between Iroquois Avenue and Denver Street and Morena Blvd between Balboa Avenue and Napa Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents