Similar Projects
Asbury Theological Seminary Future Master Plan
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Orlando, FL 32825

Asbury Theological Seminary Future Master Plan
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Orlando, FL 32825

The Registry on Grass Lake
New Construction
Design
Winter Garden, FL 34787

Fern Grove Senior Apartments - Phase 1
New Construction
Design
Orlando, FL 32808

Collegiate Village - Phase I - Retail Buildings 1, 1A, 2
New Construction - 19,605 SF
Post-Bid
$5,000,000 est. value
Orlando, FL 32826

McLaren Orlando
New Construction, Infrastructure, Renovation - 38,300 SF
Post-Bid
$10,000,000 CJ est. value
Winter Park, FL 32789

Purchase and Development of Wymore Road/Hungerford Property
Results
Orlando, FL 32809

Purchase and Development of Wymore Road/Hungerford Property
Results
Orlando, FL 32809

City Center West Orange Apartments
New Construction - 323,000 SF
Construction
$18,000,000 est. value
Ocoee, FL 34761

Retail and Dental Office - Shell
New Construction - 5,100 SF
Construction
$650,000 est. value
Winter Garden, FL 34777

Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Vintage Horizon West Apartment Complex
New Construction
Design
Winter Garden, FL 34787

O'Reilly Auto Parts (014) - Ultra Hub
Renovation - 29,276 SF
Post-Bid
$500,000 to $900,000 est. value
Orlando, FL 32804

520 Church Apartment Complex
New Construction - 350,000 SF
Construction
$70,000,000 est. value
Orlando, FL 32801

Rosemont Neighborhood Mixed-Use Development Master Plan
New Construction
Conception
$1,000,000,000 est. value
Orlando, FL 32808

Last Updated 12/07/2022 03:22 PM
Project Title

Hungerford Park

Physical Address View project details and contacts
City, State (County) Eatonville, FL 32751   (Orange County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Food/Beverage Service, Multi-Family Homes, Office, Park/Playground, Retail, Single-Family Homes, Site Development, Vocational School
Contracting Method Bids by Invitation
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $145,858,046 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a mixed use development that includes 105,120 square feet of office space, 36,000 square feet of retail and restaurant space, a 25,000 square foot civic space, a 6,600 square foot education pavilion, 203 single family homes, 150-300 apartment units and townhomes, and a public plaza. It will be constructed in multiple phases. As of December 7, 2022, this project is in conceptual stages and the developer is currently under contract to purchase the property. The project will be reviewed by the Eatonville Town Council in January 2023, however, an exact date has not been determined. A general contractor has been selected. Construction on phase one is not expected to start until 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 147,720 SF - New Construction, New Construction. 36,000 SF. 105,120 SF. 6,600 SF. New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents