Last Updated 01/18/2021 02:56 AM
Project Title

Site 2 MSWL - Phase 8A Landfill Cell Construction

Physical Address View project details and contacts
City, State (County) GA   (Newton County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be done consists of furnishing all materials, and equipment and performing all labor necessary for: Site 2 MSWL - Phase 8A Landfill Cell Construction The Project or Work consist of initiating, preparing and completing the construction of Phase 8A Landfill Cell for the purpose of filling Phase 8A with municipal solid waste as permitted by Georgia EPD. Work shall begin with the installation of BMPs and other requirements as set forth in the Land Disturbing Permit for this Work (NPDES Stormwater Permit Compliance). Maintenance, as part of the Permit, shall continue for the duration of the Project. Work shall also include the removal of debris such as concrete, wood and stone materials and clearing and grubbing of the site to begin the construction of Phase 8A. With the site cleared, excavation may begin with the removal, filling, shaping of base and finished grade to elevation, and the compaction of soils. Excavation shall be to the grades shown unless unstable or unsuitable soils are encountered. The 5.2 acre Phase 8A solid waste landfill will be built up with 24 inches of compacted soil liner on base grades. The liner will be overlain with reinforced geosynthetic clay liner, HDPE geomembrane liner, geonet drainage media, cushion geotextile and protective cover. These landfill components shall be installed according to the Contract Documents and regulatory requirements. Ancillary activities included in the Work are: maintenance of erosion and sediment control devices, clearing and grubbing, stripping, hauling and stockpiling soil, building access roads, relocating a sediment pond dam, furnishing and installing a prefabricated flare system, and constructing a storm water system as shown as required by the Contract Documents. Furnishing and installing a prefabricated flare system will include sitework, piping, connections, pilot gas, fencing and gates, blowers, controls, electrical and all other appurtenances.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents