Reported | 05/21/2022 12:00 AM |
Project Title | Expansion of Arlington National Cemertery - Phase II; South Parcel Operations Complex Project |
Physical Address | View project details and contacts |
City, State (County) | Arlington, VA (Arlington County) |
Category(s) | Religious/Funeral |
Sub-Category(s) | Funeral Facility |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Norfolk District is conducting Market Research to identify potential sources for construction of the facilities identified below and receive industry feedback on the benefits, disadvantages, and risks associated with completing the effort as a single contracting action (a single combined project) or completing as individual, discrete construction efforts (two projects) on a similar timeline. The two distinct construction elements of the project are adjacent to one another, the cemetery expansion elements of work will be located north of realigned Columbia Pike and the vertical construction elements for the operations building, warehouse buildings, and 2-story parking garage are located immediately south of realigned Columbia Pike. A separate contract, through Federal Highway Administration, will be issued for realigning the Columbia Pike roadway and utility relocations project. Coordination during construction will be required with Federal Highway Administration and its contractor. Operations Building, Maintenance Facilities, Warehouse Buildings, Parking Garage: Construct operations building (administrative space, offices, conference rooms, and training facilities) and maintenance facilities, laydown and storage space (90,000 GSF); and a parking structure for government vehicles, employees, family members, and visitors. Buildings will include climate control, interior lighting, toilet facilities, elevator systems, interior furnishings and equipment, and security systems. Building constructions shall be suitable for the environment and compliment the architectural theme and considerations of Arlington National Cemetery. Provide special foundations to address the varying soil conditions on the site. Improvements also include landscaping, plantings and all supporting utilities to include water, sanitary sewer, storm sewer, natural gas, communications/information systems, and underground electrical service. Site infrastructure will include roads, staging / parking areas, pedestrian walkways, and curbs and gutters. Anti-terrorism/force protection measures shall be included to the extent required by regulation and all constructions shall comply with ADA requirements and considerations. Cemetery Expansion, Columbaria, Committal Shelter, and Air Force Memorial Integration: Develop approximately 50 acres of land previously identified as the Navy Annex site and from the realignment of local and state roads to increase burial space at Arlington National Cemetery. Project will provide approximately 70,000 additional interment spaces in a manner consistent with the character of Arlington National Cemetery. The project will involve substantial earthwork including large scale excavation and grading in soils characteristic to the project site, extensive landscaping and installation of high-quality turf, and culturally significant structures with monumental decorative or commemorative stonework. The improvements include committal service shelters, circulation space (both vehicular and pedestrian). The majority of the earthwork will be performed during the roadway realignment project. The existing Air Force Memorial will be incorporated into the Arlington National Cemetery to provide a seamless experience to visitors through the relocation and alteration of existing cemetery boundary walls and addition of a pedestrian access point. Exterior site improvements include pre-set concrete crypts for in-ground burials, in-ground cremated remains, above-ground columbaria, an ornamental security and boundary fence, secure pedestrian access point, visitor and family gathering and reflection areas, reconstruction of the historic Sheridan Gate, construction of a new gate to be named in honor of Freedman's Village, landscaping, plantings and all supporting utilities to include water, sanitary sewer, storm sewer, natural gas, communications / information systems, and underground electrical service. Site infrastructure will include roads, pedestrian walkways, and curbs and gutters. Includes limited hazardous materials remediation and removal, as required. Demolition will include existing burial operations complex, existing roadways, parking areas, utilities and related improvements. Provide special foundations to address the varying soil conditions on the site. Anti-terrorism/force protection measures shall be included to the extent required by regulation and all constructions shall comply with ADA requirements and considerations. Work will need to be coordinated with cemetery operations. The New Operations Complex must be completed and operational prior to demolishing the existing operations complex. At this time, the Government anticipates awarding, under a separate construction contract by Federal Highway Administration, a road construction project that includes: realignment of Columbia Pike and relocation of utilities construction of a tunnel under the relocated Columbia Pike connecting the north and south Cemetery parcels construction of retaining walls along the southern- and western-most boundaries of the south parcel Coordination between the two projects will be frequent. The road realignment and utilities will need to occur prior to construction of the cemetery, and the new operations complex will need to be complete and operational prior to demolishing the existing operations complex. Construction will need to be phased strategically. |
||||||||||||||||||||||||||||||||||||||||||
Details | Misc. Buildings, Approximately 90,000 SF Addition.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |