Similar Projects
Townsend Elementary School Cooling Tower Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Townsend, TN 37882

HVAC Safety Platforms Williamson County Schools
Renovation
Sub-Bidding
$300,000 CJ est. value
Franklin, TN 37064

HVAC Unit Replacement for Athens City Middle School
Post-Bid
Athens, TN 37303

EHS Main Campus Replace AHU for Ancillary West 5th Floor LDR Penthouse
Post-Bid
Chattanooga, TN 37403

McWherter Center HVAC Updates Phase 2
Results
Jackson, TN 38301

Cooling Tower Replacement at Independence High, Chapmans Retreat ES, Heritage ES and Boiler Replacement at Kenrose ES, Heritage ES, Westwood ES
Results
Brentwood, Fairview, Spring Hill, Thompson's Station, TN 37179

Water Source Heat Pump Console and Rooftop Units and Installation
Renovation
Construction
$397,000 CJ est. value
Woodbury, TN 37190

HVAC Replacement at Gallatin Development TN029-14
Renovation
Sub-Bidding
$443,000 CJ est. value
Gallatin, TN 37066

Chemically Treat HVAC Systems
Term Contract
Post-Bid
Chattanooga, TN

HVAC Replacement at Pleasant Ridge
Results
LaFollette, TN 37766

MU1 and MU2 Make-Up Carousel Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Nashville, TN 37217

HVAC Preventative Maintenance
Term Contract
Post-Bid
White House, TN 37188

Two HVAC Units Replacement at Chattanooga TN Air Traffic Control Tower
Results
Chattanooga, TN 37421

HVAC Replacement Blythe Bower Elementary School
Renovation
Sub-Bidding
$400,000 CJ est. value
Cleveland, TN 37311

Clairfield HVAC
Post-Bid
Clairfield, TN 37715

Last Updated 09/27/2022 02:33 AM
Project Title

Carver Museum - HVAC Replacement

Physical Address View project details and contacts
City, State (County) Brownsville, TN 38012   (Haywood County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project primarily consists of the construction of the following: 1. Demolition of the existing 20 ton suspended air handler and roof mounted condensing unit. The existing distribution duct and duct heater shall remain. 2. Demolition of existing CMU wall in the adjacent storage closet, and placement of new concrete equipment pad. 3. Placement of a new 20 ton air handler unit in the adjacent storage closet, to include new louvered doors for return air, piping for the condensate through the exterior wall, opening in the wall for the supply air duct to route and connect back into the existing distribution ductwork. 4. Placement of a new condensing unit on the adjacent roof, and new refrigerant piping routed between the air handler and the condenser

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents