Similar Projects
OR 241: Chandler (Coos River) Bridge
Infrastructure
Design
$4,262,000 CJ est. value
Coos Bay, OR 97420

Powers-Agness Hwy: Burma Slide Sec (MP4.4-8.4)
Infrastructure
Design
$13,657,312 CJ est. value
Myrtle Point, OR 97458

Water System Improvements
Infrastructure
Post-Bid
$250,000 CJ est. value
Myrtle Point, OR 97458

Water System Improvements
Infrastructure
Post-Bid
$250,000 CJ est. value
Myrtle Point, OR 97458

Highway 101 Inversion Lining Project
Alteration
Results
$125,000 to $155,000 est. value
Coos Bay, OR 97420

Reconstruct and Expand Apron - Phase 1
Infrastructure
Results
$6,070,887 CJ est. value
North Bend, OR 97459

Bandon Beach Hotel
Demolition, New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Bandon, OR 97411

US 101 at East Bay Road
Infrastructure
Design
$1,631,000 CJ est. value
Bandon, OR 97411

RFQ Design - Conceptual Design and Siting of the Proposed Coos Bay Library at Topits Park
New Construction, Infrastructure
Post-Bid
$18,600,000 CJ est. value
Coos Bay, OR 97420

2022 Bundle Water Main Replacement
Infrastructure
Results
$535,000 est. value
Coos Bay, OR

Shutters Landing Bore Project
Infrastructure
Post-Bid
$300,000 CJ est. value
North Bend, OR 97459

3rd and Central Ave Green Parking Lot
Infrastructure
Results
$1,210,980 CJ est. value
Coos Bay, OR 97420

Health Services Expansion Project
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$4,000,000 CJ est. value
Coos Bay, OR 97420

8th Street Railroad Path Crossing
Infrastructure
Results
$245,992 CJ est. value
Lakeside, OR 97449

Grocery Outlet Site Development and New Shell Building
New Construction, Infrastructure - 16,456 SF
Post-Bid
$4,400,000 CJ est. value
Bandon, OR 97411

Last Updated 06/15/2023 08:34 AM
Project Title

WTP Standby Power System Improvements

Physical Address View project details and contacts
City, State (County) Fairview, OR 97423   (Coos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $874,159 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bandon intends to construct an auxiliary standby power system to serve the water treatment plant, three raw water pump stations, fish hatchery and several private resident Technical or bidding inquiries should be directed to Steve Major, PE, at The Dyer Partnership, Engineers & Planners, Inc. by email: smajor@dyerpart.com or (541) 269-0732.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents