Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Advance Notice - FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Design
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Part 139 Airfield Improvements
Infrastructure
Bidding
Tampa, FL 33607

Taxiway A Extension and Mitigation, Key West International Airport
Infrastructure
Bidding
Key West, FL 33040

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Rehabilitation of Runway 9L-27R Touchdown Zone Keel Repair
Infrastructure
Bidding
Sanford, FL 32773

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Runway 5-23 and Apron Rehabilitation George T Lewis Airport
Results
Cedar Key, FL 32625

Reported 06/16/2021 12:00 AM
Project Title

Runway 9-27 Rehabilitation at Space Coast Regional Airport

Physical Address View project details and contacts
City, State (County) Titusville, FL 32780   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $4,262,900
Plans Available from Engineer - 05/19/21
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing Runway 9-27 shoulder, including unused connector and rehabilitate existing Runway 9-27.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents