Similar Projects
Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

The Commons of Forsyth County Preschool
New Construction, Renovation
Design
Winston-Salem, NC 27101

CDBG - Neighborhood Revitalization
Renovation
Bidding
Roanoke Rapids, NC

Goraleigh Park and Ride Lot
Renovation, Infrastructure
Bidding
Raleigh, NC 27610

North Waterfront Park Project
Post-Bid
Wilmington, NC

Hoover Road Athletic Park
Post-Bid
Less than $8,500,000 est. value
Durham, NC

Enloe High School Track Replacement
Results
Raleigh, NC 27610

Running Track Resurfacing
Results
Less than $739,700 est. value
Cullowhee, NC

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Construction of Shingle Landing Park
Construction
Less than $2,513,020 est. value
Moyock, NC

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Splash Pad Installation Lake Rim Park
Renovation
Bidding
Fayetteville, NC 28314

Pleasant Park
Post-Bid
Less than $36,000,000 est. value
Apex, NC 27502

Randolph Johnson Park Improvements
Results
Beaufort, NC

Athletic Improvements at West Brunswick High School
Construction
Shallotte, NC 28470

Last Updated 07/29/2021 09:42 AM
Project Title

Battle Park Multi-Use Natural Surface Trail

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC   (Edgecombe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Professional trail contractor to provide labor, supervision, materials and equipment to construct a machine-built multi-use, natural surface 5k trail at Battle Park. Battle Park is in Rocky Mount, located in eastern NC (not the mountains of NC). The park is bordered to the north by US-64 and to the south by the Tar River. The I-95 / US-64 interchange is located four miles west of the park. Battle Park (+/- 60 acres) is being fully renovated for the first time since its opening in 1976. This new multi-use, natural surface trail will be the first such trail in the city parks’ system and the first public trail available for mountain bike use in the two counties Rocky Mount straddles (Edgecombe and Nash). If the trail is popular, the City has adjacent property to expand the trail in the future. Located in the coastal plain, much of Rocky Mount is flat. Battle Park is located on the natural fall line of the Tar River which provides slight topographic relief (60’ to 116’ above sea level) and numerous rock outcroppings, both are unique for the area. The City anticipates the trail will capitalize on these features, providing a beginner to intermediate trail for cross-country runners and mountain bike riders

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents