Similar Projects
Town of Vass Phase 2 Sewer Extension Project
Infrastructure
Bidding
$7,000,000 est. value
Vass, NC

Wastewater Improvements
Infrastructure
Bidding
$2,000,000 est. value
Walstonburg, NC

Sanitary Sewer Extension at Elizabethtown Industrial Park Executive Drive
Post-Bid
Elizabethtown, NC

Water and Sewer Maintenance 2021-2022
Post-Bid
High Point, NC

Crabtree Creek and West Neuse Interceptor Rehabilitation
Results
Less than $12,000,000 est. value
Raleigh, NC 27601

2021 Stormwater Pipe Repair Project
Results
Less than $447,656 est. value
Greenville, NC

North Carolina DHHS Campus Phase 1 Motor Fleet Management Utilities Relocation
Infrastructure
Construction
Raleigh, NC

I-74/I-95 Industrial Park
Infrastructure
Construction
Lumberton, NC

2019 CWSRF Sanitary Sewer Improvements Contract No. 6 - Sewer Replacement and Pump Station Rehabilitation
Infrastructure
Bidding
$2,000,000 est. value
Lucama, NC

Sanitary Sewer Lift Station Replacements
Post-Bid
Landis, NC

Rutherfordton Sewer to RS Central High School and Middle School
Results
Rutherfordton, NC 28139

Engelhard Sanitary District Force Main Extension
Infrastructure
Bidding
$2,000,000 est. value
Engelhard, NC

Installation of Private Sewer Service Lateral Connections - 7720 Rogers Road
Post-Bid
Chapel Hill, NC 27516

Cherry Lane Sanitary Sewer Outfall
Results
$2,487,359 est. value
Graham, NC 27253

Raleigh Water Collection System Condition Assessment
Infrastructure
Bidding
Raleigh, NC

Last Updated 07/04/2022 09:24 AM
Project Title

Phase V Briery Run Outfall Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Kinston, NC   (Lenoir County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,529,300 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Access and work for each manhole will require construction mats. Raise 11 manholes to insure that top is 2 feet above the 100 year flood elevation. Clean and line 9 manholes using cured in place method. Replace 5 manholes; and clean and do televised inspection on 3,100 feet of the 30 inch sewer pipe prior to rehabilitation. Rehabilitate approximately 3,100 feet of 30 inch sewer pipe using cured in place pipe to line the old pipe. Perform televised inspection of 3100 feet of pipe after rehabilitation to insure CIPP rehabilitation was successful.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents