Similar Projects
Baker Estate Aquisition
Bidding
$200,000 to $499,999 est. value
Montoursville, PA

Tributary to Grafius Run Bank Stabilization Project
Post-Bid
Williamsport, PA

Construction of Salt Run Bank Stabilization Project
Post-Bid
Trout Run, PA 17771

Hughesville Streambank Protection Project
Results
Hughesville, PA 17737

Emergency Watershed Protection
Results
PA

Levee Rehabilitation Project
Post-Bid
PA

Muncy Creek Streambank Protection Project 101
Results
Hughesville, PA 17737

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

HDPE Pipe and Landfill Gas Well Accessories
Results
Williamsport, PA

6' Diameter By 30' Long Aluminized Type II Pipes and Connecting Bands
Results
Muncy, PA

SR 3018 over 1stFrkLarrysCr
Results
$200,000 to $499,999 est. value
PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Flood Repairs
Results
Less than $1,000,000 est. value
Trout Run, PA 17771

Pleasant Hills Road Bank Stabilization Project
Results
Montoursville, PA 17754

Bush Hill Road Bank Stabilization Project
Results
Montoursville, PA 17754

Last Updated 03/18/2020 09:35 AM
Project Title

Stream Bank Stabilization Contract

Physical Address View project details and contacts
City, State (County) Muncy, PA   (Lycoming County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Place approximately 498 CY of slope fill material; perform approximately 440 CY of Keyway Excavation/Hydraulic Hammer; furnish and place approximately 2,036 SY of geotextile; furnish and place approximately 456 Tons of AASHTO #1 Stone; furnish and place approximately 3,045 Tons of R-8 rock; furnish and place approximately 239 Tons of gabion stone; furnish and place approximately 636 Tons of 2A subbase; install approximately 40 LF of cross pipe; perform approximately 36 CY of class 4 excavation, and furnish and place approximately 40 Ton of R-6 rock.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents