Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Pre-Qualified Contractors for Construction - Related - SOJO
Infrastructure
Bidding
South Jordan, UT

Lee Drain Bank Stabilization-Piping of Canal at Pioneer Road
Infrastructure
Bidding
$977,100 est. value
Salt Lake City, UT 84129

Segmented Pipe Liner
Term Contract
Post-Bid
UT

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

Crab Creek Restoration
Results
$310,000 to $330,000 est. value
Provo, UT 84606

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Causeway Breach Berm Modification
Term Contract
Bidding
Salt Lake City, UT

Construction of the Upper Telluride Penstock Pipeline Replacement Phase 1
New Construction, Infrastructure
Post-Bid
Beaver, UT

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

West Drainage Project 2022
Infrastructure
Bidding
$400,000 est. value
Green River, UT

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Post-Bid
Orem, UT 84097

Green River MS4
Results
Green River, UT 84525

Construction of the Springdale Blacks Canyon Restoration Project
Infrastructure
Bidding
$800,000 est. value
Springdale, UT

Uintah Indian Irrigation Project
Infrastructure
Post-Bid
UT

Reported 06/22/2022 12:00 AM
Project Title

Cedarview Reservoir Pipeline Installation

Physical Address View project details and contacts
City, State (County) Fort Duchesne, UT   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The Ute Indian Tribe (Tribe) is accepting proposals for the design and construction of a pipeline and diversion structures located on the Uintah and Ouray Indian Reservation. The Tribe desires to construct a 1.83-mile pipeline along the current route of the Cedarview Canal that supplies water to the Cedarview Reservoir located at lat:40.5583, Long:-110.1333.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents