Similar Projects
Phase 8 Paving Package for Bridgewater
Infrastructure
Bidding
TX

Liberty Trails, Phase 3 - Paving Improvements
Post-Bid
TX 76100

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

MFR Water Treatment Plant Roadway Rehabilitation and Extension
Results
Less than $195,375 est. value
Harlingen, TX 78550

DNT Frontage Road from FM 428 to Grayson County Line
Results
$18,986,710 est. value
Pilot Point, TX 75258

2021 Street Improvement
Post-Bid
Argyle, TX

North Street Mary's Street (East Mistletoe Avenue - West Josephine Street)
Results
$7,897,680 est. value
San Antonio, TX 78200

2021 Street Reconstruction Projects
Post-Bid
Aubrey, TX

Road Construction Services
Results
Less than $2,000,000 est. value
Cuero, TX 77954

Travis Ranch Phase 2K Paving Improvements
Post-Bid
Dallas, TX

Carroll Drive Paving Water and Wastewater Main Replacement
Results
Less than $2,112,753 est. value
Garland, TX 75040

2017 Hurricane Harvey GLO CDBG-DR Labahia Street Improvements Project
Infrastructure
Post-Bid
TX

2021 Saws Paving Contract Project Around Cosa, Bexar County and TxDOT Right-of-Way
Results
Less than $1,978,692 est. value
San Antonio, TX 78212

Water, Sanitary Sewer, Drainage, and Paving Improvements for Big Sky Estates Phase 2
Infrastructure
Post-Bid
TX

Old Magnolia Road Improvement Project
Results
San Diego, TX

Reported 02/23/2022 12:00 AM
Project Title

Curb and Gutter Removal and Replacement SIP 2022

Physical Address View project details and contacts
City, State (County) TX 75482   (Hopkins County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include Removal of existing driveway approaches and culverts and or removal of existing curb and gutter, establishing a profile line and grade, preparing a sub grade under the new section of street, placing forms and installing new curb and Gutter in various locations. See details. Locations: Brinker Street from Tate to Peach: 1300LF of new Curb and Gutter, see picture. California Street from Church to Davis: 500 LF remove and replace existing along north side of Street, see picture. Contractor will excavate and haul off material and set line and finish grade.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents