Similar Projects
BP 5 Transportation Access Road and Fuel Tank
Post-Bid
Southfield, MI

Fuel Pump Repairs
Post-Bid
Dearborn, MI

Fuel Dispensing System at the Educational Service Center
Results
Less than $905,362 est. value
Clinton Township, MI

Sault Tribe Housing Authority - Odenaang Natural Gas Conversion
Results
Less than $64,885 est. value
Sault Sainte Marie, MI

5,250 Gallon Double Wall Polyethylene Vertical Storage Tank One Time Purchase
Post-Bid
Clinton Township, MI 48036

Fuel Facility Replacement at the North Complex
Results
Cedar Springs, MI

2020 Wastewater Treatment Plant Bulk Chemicals
Post-Bid
Ypsilanti, MI

Marina Fuel System And Service Dock Replacement
Results
Cheboygan, MI

Propane & Tanks
Post-Bid
Wayne, MI

Fuel
Results
Honor, MI

2019 Bond Fuel Tank Replacement Project
Post-Bid
Whittemore, MI 48770

Purchase and Installation of Two Fiberglass Reinforced Plastic (FRP) Tanks
Results
Wyoming, MI

H291--Diesel Tank Cleaning,Testing and Winterization
Post-Bid
Battle Creek, MI 49037

Fuel Systems-District 3 Lake Orion Island Replacement
Results
Beverly Hills, MI 48025

Fiberglass Brine Storage Tank
Alteration
Post-Bid
Troy, MI 48083

Last Updated 09/07/2021 10:49 AM
Project Title

Water Pollution Grit Bat B System and Primary Tank Improvements

Physical Address View project details and contacts
City, State (County) Flint, MI   (Genesee County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of improvements to the primary clarifiers and Grit Battery B at the City of Flint Water Pollution Control Facility. The work includes improvements to the ten primary clarifiers including replacement of existing primary clarifier sludge collection mechanisms, primary clarifier influent gates, effluent trough, and concrete rehabilitation. The work also includes improvements to the Grit Battery B including replacement of the aerated grit removal system with four stacked tray grit settlers, installation of two mechanical bar screens with washer compactor units, installation of grit washer and classifier units, replacement of existing 60-inch influent pipe, gate replacement, building addition to house screenings and grit dumpster, building improvements, concrete rehabilitation and electrical system improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents