Similar Projects
Asbestos Abatement at Innovation Center
Alteration
Bidding
$32,000 est. value
Detroit, MI 48239

Asbestos Abatement and Selective Interior Demolition
Demolition
Post-Bid
Lincoln Park, MI 48146

Detroit Demolition Department - Environmental Due Process
Alteration
Post-Bid
Detroit, MI

Central Office Asbestos Abatement
Results
Livonia, MI 48150

Abatement Project - Spring 2021 Work Program
Results
Grosse Pointe, MI 48230

Residential Abatement
Alteration
Post-Bid
Detroit, MI

Vibration Analysis, Balancing, and Alignment
Term Contract
Results
Wayne, MI

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Asbestos Abatement at GCHS Pool Area Prior to Renovation
Alteration
Results
Garden City, MI

Graffiti Removal Contract
Term Contract, Alteration
Post-Bid
MI

Gibson Elementary School Asbestos Abatement
Alteration
Results
Redford Township, MI 48239

Asbestos Survey
Term Contract
Post-Bid
Detroit, MI

Asbestos Abatement
Term Contract
Results
Detroit, MI

Lead Abatement/Minor Repair Services
Alteration
Post-Bid
Wayne, MI

Abatement Project - Spring and Summer 2022
Alteration
Results
Grosse Pointe, MI

Last Updated 07/06/2022 12:13 AM
Project Title

MSP Northville Forensic Lab Shooting Range - Lead Abatment

Physical Address View project details and contacts
City, State (County) Northville, MI 48167   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the removal of trees within the limits of disturbance and excavating and transporting soil from the southern berm as RCRA characteristic hazardous waste (D008) due to lead. The primary backstop berm and side berms are to be excavated and transported as hazardous soil. The disturbed areas where excavation takes place will be topped with 4 inches of topsoil and graded to match the natural grade of the area. Some water management is expected as part of this work, as the site currently has some standing water that must be removed before work can begin.

Details

Division 02 - Existing Conditions, Lead Remediation, Lead-Based Paint Remediation, Lead-Based Paint Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents