Similar Projects
New Huntington Middle School & Community Center
New Construction
Conception
$57,000,000 est. value
Newport News, VA

Future Western High School
New Construction
Conception
$157,707,000 est. value
VA

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Design
$55,000,000 to $81,000,000 est. value
Alexandria, VA 22309

Hermitage and Highland Springs ACE Centers Renovations
New Construction, Renovation - 145,000 SF
Design
$53,000,000 est. value
Henrico, VA 23228

Scott Memorial Middle School
New Construction
Bidding
$400,000 est. value
Wytheville, VA 24382

William and Mary Integrated Science Center (ISC) 4 project
New Construction - 129,000 SF
Bidding
$73,266,000 est. value
Williamsburg, VA 23185

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

Job Order Contracting (JOC) - General Construction Services
Term Contract
Post-Bid
$5,000 to $200,000 est. value
Fredericksburg, VA

Elkhardt-Thompson (Hull Street) Middle School Project
New Construction - 170,600 SF
Results
$50,000,000 est. value
Richmond, VA

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

Construction of the Westmoreland High School Replacement (Washington and Lee)
Construction
$44,500,000 est. value
Montross, VA 22520

Development, Design and Construction of a New High School
New Construction - 257,800 SF
Construction
$85,674,472 est. value
Harrisonburg, VA 22801

New Career Center
New Construction
Pending Verification
$150,000,000 to $170,000,000 est. value
Arlington, VA 22204

New High School
New Construction
Pending Verification
$120,000,000 est. value
South Boston, VA

Franklin Middle School Renovations
Renovation
Conception
$71,411,764 est. value
Chantilly, VA 20151

Reported 06/30/2022 05:34 PM
Project Title

Smithfield High School Bathroom Renovations - 21-SCH-03 - Town of Smithfield

Physical Address View project details and contacts
City, State (County) Smithfield, VA 23430   (Isle of Wight County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $960,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Smithfield, Virginia. Conceptual plans call for the renovation of a two-story above grade educational facility. The high school bathrooms require renovations for asset protection and functionality. The total cost is approximately $870,000 but can be done in 3 phases during FY22, FY23, and FY24. The number of Student bathrooms are as follows: 1st Floor: 15; 2nd Floor: 2. This includes the lavatories located in the locker rooms. All renovations would be ADA compliant. As of June 29, 2022, this project is currently in the FY 2023 - 2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents