Similar Projects
HVAC System Replacement
Alteration
Bidding
Holbrook, NY 11741

Cath/EP Lab Renovations HVAC Controls
Renovation, Alteration
Bidding
Stony Brook, NY 11794

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Duct Cleaning and Mold Remediation and Abatement Services
Term Contract
Post-Bid
Stony Brook, NY

Remove, Supply and Install Two Inverters/Heat Pumps at USCB STA Fire Island
Term Contract
Results
$25,000 est. value
Babylon, NY 11702

Combination of Bond Phase 2,3 and 4 - HVAC
Alteration
Results
Bohemia, Ronkonkoma, NY 11716

Green Heating and Cooling East Hampton Town Campaign
Alteration
Post-Bid
East Hampton, NY

Packaged Terminal Air Conditioner (PTAC) Units
Term Contract, Alteration
Results
Stony Brook, NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Auditorium at East Islip Middle School
Alteration
Results
Islip Terrace, NY 11752

HVAC Service and New Installations
Term Contract
Post-Bid
Yaphank, NY

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

Building Automation System Repairs (Hvac)
Alteration
Post-Bid
$250,000 to $500,000 est. value
Shoreham, NY 11786

District Wide Ventilation Upgrades
Alteration
Results
Less than $1,500,000 est. value
Dix Hills, NY 11746

Remove, Supply and Install Three Inverters/Heat Pumps
Term Contract
Post-Bid
Babylon, NY 11702

Last Updated 02/15/2022 04:12 PM
Project Title

HVAC Mechanical Upgrades Phase 2

Physical Address View project details and contacts
City, State (County) Patchogue, NY 11772   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Separate Bid Packages MC-1 PC-1 EC-1 Base Bid: The scope of work is to remove and replace a total of nine (9) existing Rooftop HVAC units for the West Building with new units that use Direct Expansion Refrigeration Cooling & Gas Heating Rooftop HVAC Units. Work also includes addition of new low pressure natural gas service to the Hines Administration Building. Scope includes removal and replacement of existing air separator in West Boiler Room. Additionally, scope includes Maintenance & Tube Cleaning of Existing Boiler in East Boiler Room. There is rebalancing of all air flows for all spaces served by all nine (9) Rooftop HVAC units in the West Building. Add Alternate Work #1: Removal and Replacement of Boiler, How Water Pumps, Combustion Air System, & Breeching/Chimney stack for West Boiler Room. Add Alternate Work #2 Removal of existing air cooled chiller, concrete pad, chain link fence & excavate and backfill with clean fill & compact outside. In West Boiler Room, removal of existing chilled water pumps, existing chilled water expansion tank. Add Alternate Work #3 Replacement of select air outlet devices in spaces in West Building being served by the nine (9) new packaged rooftop HVAC units & moving of some existing air outlets closer to windows where permissible based on existing building structural elements in ceiling.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents