Similar Projects
Highlands Drive Area Waterline Replacement
Infrastructure
Bidding
$1,444,304 est. value
Smyrna, GA 30082

Creatwood Trail Area Waterline Replacement
Infrastructure
Bidding
$200,000 est. value
Smyrna, GA

Heron Bay Force Main D
Post-Bid
Marietta, GA

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

Materials for South Cobb Drive Waterline Project
Results
Smyrna, GA 30080

Fy22 Miscellaneous Water Main Replacements
Results
Marietta, GA

2023 Blow-Off Replacements
Infrastructure
Bidding
$2,000,000 est. value
Marietta, GA

Pre-Qualifying Pipeline Contractors
Infrastructure
Post-Bid
GA

Wilderness Way Two Way Water Feed
Results
GA 30066

Materials For San Fernando Drive Waterline Project
Infrastructure
Post-Bid
Smyrna, GA

Fire Hydrant Testing and Maintenance
Term Contract
Results
$135,000 est. value
Acworth, Austell, Kennesaw, Mableton, Marietta, Powder Springs, Smyrna, GA 30127

Indian Trail Water System Improvements
Results
$925,076 est. value
Marietta, GA

Annual Contract - Fire Hydrant Inspection and Maintenance
Term Contract
Results
Acworth, Austell, Kennesaw, Mableton, Marietta, Powder Springs, Smyrna, GA 30008

Tramore Interceptor Sewer Rehabilitation
Results
Marietta, GA 30060

Kinridge Road Area Water Main Replacement
Alteration
Results
Marietta, GA 30062

Reported 06/10/2022 12:00 AM
Project Title

Annual Contract - Full Service Maintenance Agreement for Valves and Actuators

Physical Address View project details and contacts
City, State (County) Marietta, GA   (Cobb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide a full service maintenance agreement to inspect, service, and maintain valves and actuators located at CCWS Water Reclamation Facilities ("WRF"), Lift Stations, and Fresh Water Pump Stations. Personnel from various locations shall direct work of Contractor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents