Similar Projects
Murphy USA #7306 / Muncie
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Muncie, IN 47305

Wes-Del Athletics Phase 1 Track-Football
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Gaston, IN 47342

2021-1 CCMG Resurfacing Design
Infrastructure
Post-Bid
Gaston, IN

County Roads and Bridges Reconstruction
New Construction, Term Contract, Infrastructure
Post-Bid
IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Intersection Improvement, Roundabout
Infrastructure
Results
IN

Discovery Park Expansion - Muncie Childrens Museum
Addition, Demolition, Infrastructure
Pending Verification
$350,000 CJ est. value
Muncie, IN 47305

RNR Tire Express Expansion
Addition, New Construction, Infrastructure
Pending Verification
$120,000 CJ est. value
Muncie, IN 47303

Resurfacing & Road Improvements
Infrastructure
Post-Bid
Muncie, IN

2022-01 Daleville Pavement Preservation Projects
Infrastructure
Results
Daleville, IN

Project Greathouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Muncie, IN 47302

Crack Seal and Cape Seal Pavement Preservation Project
Infrastructure
Post-Bid
Muncie, IN

Slip Lining Bridge
Renovation, Infrastructure
Results
Muncie, IN

Bridge Rehab - Pipe Lining - Indiana Department of Transportation
Infrastructure
Pending Verification
$437,930 CJ est. value
Muncie, IN 47304

Mulberry Street Paving
Infrastructure
Post-Bid
Muncie, IN 47307

Last Updated 03/28/2023 06:35 AM
Project Title

Replace Superstructure - I 69

Physical Address View project details and contacts
City, State (County) Yorktown, IN 47396   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $4,454,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NB over KILLBUCK CREEK, 00.93 N SR 332 As of March 28, 2023, the project is in Design status. Anticipated letting date is July 12, 2023. INDOT - Replace Superstructure - I 69 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents